advanced work · Community clinic renovation, Sacramento area, CA
Red List materials screen — Community clinic renovation, Sacramento area, CA
A community clinic in the Sacramento area planning renovation has no Red List materials inventory. Standard: LBC Materials petal Red List Proof: photo of each finish + GPS + Red List flag per material + product IDs Method (Living Building Challenge Materials petal Red List screening, ~45-90 min): 1. Confirm the address; walk the space methodically room by room. 2. Photograph each finish (flooring, wall, ceiling, sealant, casework) with any legible product labels. 3. Inventory each material with its product name/manufacturer where visible. 4. Flag each item against the Red List (e.g., PVC, formaldehyde, phthalates, halogenated flame retardants). 5. Recommend a compliant alternative for each flagged item. 6. Enter the material inventory, Red List flags, alternatives, and photos; sign. Equipment: tablet/clipboard, camera, LBC Red List reference, flashlight Done when: Material inventory of the in-scope finishes recorded; Red List flag recorded per item; Compliant alternative recommended per flagged item; Photos + address confirm
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: Living Building Challenge Materials petal Red List screening
Bring
- tablet/clipboard
- camera
- LBC Red List reference
- flashlight
Steps
- 1. Confirm the address; walk the space methodically room by room.
- 2. Photograph each finish (flooring, wall, ceiling, sealant, casework) with any legible product labels.
- 3. Inventory each material with its product name/manufacturer where visible.
- 4. Flag each item against the Red List (e.g., PVC, formaldehyde, phthalates, halogenated flame retardants).
- 5. Recommend a compliant alternative for each flagged item.
- 6. Enter the material inventory, Red List flags, alternatives, and photos; sign.
If it does not match the plan
- Suspected asbestos-containing material that is friable or damaged (crumbling, dust, airborne risk) -> STOP-WORK: do not disturb, restrict access to the area, and route to a licensed asbestos inspector before any work continues (EPA/AHERA).
- Suspected lead paint on a surface slated for disturbance (sanding/demolition) in a pre-1978 building -> flag as EPA RRP-regulated; route to a Lead-Safe Certified firm; the agent documents, never scrapes or does destructive testing.
- Suspected asbestos/lead-containing material (intact/undisturbed) -> do not disturb; flag and stop.
- Unlabeled material -> mark 'unknown - request product data' rather than guessing.
What counts as done
- Material inventory of the in-scope finishes recorded
- Red List flag recorded per item
- Compliant alternative recommended per flagged item
- Photos + address confirm
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.