OSHA Subpart T pre-demolition engineering-survey check — Vacant residential demolition block (Detroit)
A Detroit land-bank residential demolition is set to proceed without a verifiable written engineering survey, utility shutoff confirmation, or a NESHAP asbestos survey on file per OSHA Subpart T. Unplanned collapse and utility strikes are top demolition killers in legacy housing stock. Standard: OSHA 29 CFR 1926 Subpart T — Demolition (§§1926.850–860) Proof: photo from outside/safe positions per checklist section + GPS + Subpart T checklist + engineering-survey/utility/asbestos/access status + tiered findings routed to the competent person Method (OSHA 29 CFR 1926 Subpart T (Demolition, §§1926.850–860) pre-demolition engineering-survey verification — document-and-observe from outside or safe positions; documentation only, ~60-120 min): 1. Check in with the demolition contractor's competent person; confirm scope, don PPE, and confirm you observe-and-document only — you never enter a structurally compromised structure, never authorize demolition, and never disturb suspect materials. 2. Written engineering survey: verify a competent person's WRITTEN engineering survey of the structure AND affected adjacent structures exists on site (framing/floors/walls condition, unplanned-collapse possibility) and photograph its cover/signature page (§1926.850(a)); note bracing/shoring where fire or weathering has weakened members (§1926.850(b)). 3. Utilities: document shutoff/cap/control confirmation for electric, gas, water, steam, and sewer lines outside the building line, or the documented relocation/protection plan if a utility must stay live during the work, and that utility companies were notified (§1926.850(c–e)). 4. Hazardous materials: verify the hazardous-material determination is on file — including the NESHAP pre-demolition asbestos survey — and that any chemicals/gases/flammables in pipes or tanks were purged or controlled before work (§1926.850(f)); never sample or disturb suspect material yourself. 5. Access & falling-hazard protection: photograph protected employee entrances (sidewalk sheds/canopies where required), condition of stairways/passageways to be used, and barricading that keeps the public out of the demolition and debris-fall zones (§§1926.850(h–k)/.851). 6. Mechanical demolition (if underway or planned): from outside the exclusion zone, confirm no workers are inside the structure during ball/clamshell or machine demolition and the exclusion zone is barricaded (§1926.859). 7. For each finding, mark the condition against the Subpart T checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person / engineer. 8. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the competent person with a timestamp — never direct the demolition yourself. Equipment: hard hat + safety glasses + hi-vis vest + sturdy boots (site PPE), tablet/clipboard with the Subpart T pre-demolition checklist, camera with zoom (document structure condition from outside / safe positions), flashlight, copy request forms for the written engineering survey + utility shutoff confirmations Done when: Written engineering survey (structure + adjacent structures) verified on site and photographed, with bracing/shoring noted for weakened members; Utility shutoff/cap/control (or documented live-line protection plan) recorded for electric/gas/water/steam/sewer with utility notification; Hazardous-material determination incl. the NESHAP pre-demolition asbestos survey verified on file, purging/control documented; Access protection, public barricading, and (where applicable) the mechanical-demolition exclusion zone photographed; Every finding tiered with the competent person / engineer named; stop-work items routed with a timestamp
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: OSHA 29 CFR 1926 Subpart T (Demolition, §§1926.850–860) pre-demolition engineering-survey verification — document-and-observe from outside or safe positions; documentation only
Bring
- hard hat + safety glasses + hi-vis vest + sturdy boots (site PPE)
- tablet/clipboard with the Subpart T pre-demolition checklist
- camera with zoom (document structure condition from outside / safe positions)
- flashlight
- copy request forms for the written engineering survey + utility shutoff confirmations
Steps
- 1. Check in with the demolition contractor's competent person; confirm scope, don PPE, and confirm you observe-and-document only — you never enter a structurally compromised structure, never authorize demolition, and never disturb suspect materials.
- 2. Written engineering survey: verify a competent person's WRITTEN engineering survey of the structure AND affected adjacent structures exists on site (framing/floors/walls condition, unplanned-collapse possibility) and photograph its cover/signature page (§1926.850(a)); note bracing/shoring where fire or weathering has weakened members (§1926.850(b)).
- 3. Utilities: document shutoff/cap/control confirmation for electric, gas, water, steam, and sewer lines outside the building line, or the documented relocation/protection plan if a utility must stay live during the work, and that utility companies were notified (§1926.850(c–e)).
- 4. Hazardous materials: verify the hazardous-material determination is on file — including the NESHAP pre-demolition asbestos survey — and that any chemicals/gases/flammables in pipes or tanks were purged or controlled before work (§1926.850(f)); never sample or disturb suspect material yourself.
- 5. Access & falling-hazard protection: photograph protected employee entrances (sidewalk sheds/canopies where required), condition of stairways/passageways to be used, and barricading that keeps the public out of the demolition and debris-fall zones (§§1926.850(h–k)/.851).
- 6. Mechanical demolition (if underway or planned): from outside the exclusion zone, confirm no workers are inside the structure during ball/clamshell or machine demolition and the exclusion zone is barricaded (§1926.859).
- 7. For each finding, mark the condition against the Subpart T checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person / engineer.
- 8. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the competent person with a timestamp — never direct the demolition yourself.
If it does not match the plan
- Demolition underway or imminent with NO written engineering survey on site -> STOP-WORK: document, keep clear, route to the competent person / a registered engineer; never authorize continuation.
- Any utility not confirmed shut off/capped/controlled (or no documented protection plan for a required live line) -> STOP-WORK for affected work; route to the competent person and the utility.
- No NESHAP asbestos survey on file, or suspect friable material observed -> STOP-WORK for disturbance work; route to a licensed asbestos inspector/abatement contractor; never sample or disturb it yourself.
- Workers inside the structure during mechanical demolition, or fire-damaged members unbraced where workers must pass -> STOP-WORK; keep clear; route to the competent person.
- Any entry into a structurally compromised structure, sampling, or demolition direction -> observe-and-document only; the competent person / engineer performs and approves these. Approval and correction stay human.
What counts as done
- Written engineering survey (structure + adjacent structures) verified on site and photographed, with bracing/shoring noted for weakened members
- Utility shutoff/cap/control (or documented live-line protection plan) recorded for electric/gas/water/steam/sewer with utility notification
- Hazardous-material determination incl. the NESHAP pre-demolition asbestos survey verified on file, purging/control documented
- Access protection, public barricading, and (where applicable) the mechanical-demolition exclusion zone photographed
- Every finding tiered with the competent person / engineer named; stop-work items routed with a timestamp
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.