intermediate work · Casper, WY
Build a raised growing bed — Casper, WY
Turning idle ground into a growing bed serves the LBC Place Petal (urban agriculture) and feeds the food ladder. Standard: Living Building Challenge 4.0 — Place Petal (urban agriculture; habitat). SDG 11. Proof: before/after photos + GPS Method (Living Building Challenge 4.0 — Place Petal (urban agriculture; habitat). SDG 11.): 1. Lay out the bed/planting footprint on site. 2. Build/prepare it to spec (level, drainage, soil). 3. Plant or finish as named. 4. Photograph before/after with GPS. Done when: before/after photos + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Living Building Challenge 4.0 Place Petal — build growing infrastructure on already-disturbed ground, sited so it does not create a new problem
Bring
- gloves + eye protection
- drill/driver + bits
- saw
- untreated or naturally durable lumber
- landscape fabric (optional)
- soil + compost
- level + tape measure
- camera + phone with GPS
Steps
- 1. Photograph the site BEFORE, with GPS and timestamp.
- 2. Call 811 (or local locate) before any ground disturbance.
- 3. Confirm siting: at least 3m from a septic field, not over a utility easement, and with the required sun exposure.
- 4. Level the ground; a bed built out of level drains to one corner and fails unevenly.
- 5. Build the frame from untreated or naturally durable lumber — never CCA-treated or railway sleepers for food crops.
- 6. Line the base only if blocking a known contaminant; otherwise leave open for drainage and worms.
- 7. Fill with a soil-to-compost blend, watering in layers so it settles without later collapse.
- 8. Photograph AFTER from the same position and record dimensions and fill volume.
If it does not match the plan
- Site has a known contamination history (fill, industrial, near a busy road) -> line the base and use imported soil, or resite.
- Utility locate marks cross the footprint -> resite; do not dig.
- Only treated lumber is available -> do not build for food crops; document and stop.
- Ground cannot be levelled within roughly 2cm across the frame -> terrace or resite.
What counts as done
- Before and after photos from the same position, timestamped, GPS inside the radius
- 811/utility locate confirmed in the record
- Frame material named and confirmed untreated or naturally durable
- Frame level within roughly 2cm across its span, visible or measured
- Dimensions and fill volume recorded
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.