Anyone can start here · the senior center in Cody, WY
Clear the storm drain and refresh the mulch at the senior center in Cody, WY (2026-07-11)
the rain garden or bioswale at the senior center in Cody, WY has trash and leaf litter blocking its inlet and its mulch bed has thinned out. Clear the blockage by hand, top up the mulch, and come back on schedule so it keeps soaking up the rain instead of flooding the street. Standard: EPA GI inspection; SDG 6.3/11.5 Proof: before/after photos of the inlet + GPS + debris-cleared confirmation + mulch depth restored Method (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Asset type + overall condition recorded; Inlet + outlet clear/blocked status recorded; Standing-water / infiltration observation recorded; Sediment/trash level + maintenance recommendations + GPS + photos
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.