intermediate work · the 4400-4900 block of Crenshaw Blvd, storm drains + downspouts, Hyde Park, Los Angeles, CA 90043

Build a curb-cut rain garden at the 4705 Crenshaw Blvd downspout site, Hyde Park, Los Angeles, CA 90043

the 4705 Crenshaw Blvd downspout site sheds its roof's runoff straight into the gutter every storm; a planted, sunken rain garden fed by the downspout is the direct Water-Petal repair โ€” the roof's rain becomes the garden's water budget. Standard: EPA GI inspection; SDG 6.3/11.5 Proof: before/after photos + basin depth/sizing log + native-plant list + infiltration water-test + GPS Method (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Asset type + overall condition recorded; Inlet + outlet clear/blocked status recorded; Standing-water / infiltration observation recorded; Sediment/trash level + maintenance recommendations + GPS + photos

Where
the 4400-4900 block of Crenshaw Blvd, storm drains + downspouts, Hyde Park, Los Angeles, CA 90043
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + basin depth/sizing log + native-plant list + infiltration water-test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-29

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30โ€“75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.