advanced work · an auto-repair shop lot at the 4300 block of S Figueroa St, Los Angeles, CA 90037

Apply a reflective cool-pavement coating to the shop's customer lot, 4300 block of S Figueroa St

The audit found this shop's dark asphalt lot absorbing full sun all day, radiating heat back at every parked car and pedestrian crossing it; a high-albedo pavement coating cuts that surface heat gain directly. Standard: ASHRAE Level 1 audit; LBC Energy petal screening Proof: permit/manufacturer spec sheet + before/after surface-temperature reference photos + coverage-rate log + cure-time confirm + GPS Method (ASHRAE Level 1 energy audit, ~60-120 min): 1. Confirm the address; arrange a staff escort for mechanical/back-of-house. 2. Photograph HVAC, lighting, envelope, and any in-scope systems. 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition. 4. Summarize 12 months of utility use (kWh / therms) from the bills. 5. Take the in-scope measurements (light levels, unit temperatures, seal condition). 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic. 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign. Equipment: tablet/clipboard, tape measure, light meter (lighting scope), clamp thermometer (refrigeration scope), 12-month utility bills, camera, ladder + spotter (high fixtures) Done when: System inventory complete for the in-scope equipment; 12-month utility use summary recorded; In-scope measurements recorded with units; Ranked no-cost/low-cost + capital measure list produced

Where
an auto-repair shop lot at the 4300 block of S Figueroa St, Los Angeles, CA 90037
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit/manufacturer spec sheet + before/after surface-temperature reference photos + coverage-rate log + cure-time confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-08-31

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: ASHRAE Level 1 energy audit

Bring

Steps

  1. 1. Confirm the address; arrange a staff escort for mechanical/back-of-house.
  2. 2. Photograph HVAC, lighting, envelope, and any in-scope systems.
  3. 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition.
  4. 4. Summarize 12 months of utility use (kWh / therms) from the bills.
  5. 5. Take the in-scope measurements (light levels, unit temperatures, seal condition).
  6. 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic.
  7. 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.