advanced work · a family home near Robertson Avenue, Worland, WY 82401

Document weatherization readiness at a Robertson Avenue home, Worland

This Robertson Avenue home's windows, attic and panel have never been checked against a retrofit plan — with Washakie County winters running months below freezing, the readiness picture is what turns guesswork into a right-sized sequence of fixes. Standard: Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2. Proof: photo inventory (window condition, attic, panel label) + GPS + ranked readiness list Method (Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2.): 1. Walk the home with the occupant and photograph every window/door assembly, noting visible condition and draft complaints. 2. Photograph the electrical panel label (service amperage + spare-slot count) from outside the equipment — observation only, never open the panel interior. 3. Check the attic hatch and record visible insulation depth and any gaps where accessible without disturbing material. 4. Compile a ranked readiness list naming the follow-on job for each shortfall (gutter/downspout, attic top-up, pipe protection). Done when: photo inventory (window condition, attic, panel label) + GPS + ranked readiness list

Where
a family home near Robertson Avenue, Worland, WY 82401
Pay
$130 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo inventory (window condition, attic, panel label) + GPS + ranked readiness list

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-08-31

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.