intermediate work · Peoples Church, 7172 N Cedar Ave, Fresno, CA 93720
Run an ASHRAE Level 1 energy audit at Peoples Church
A campus this size (sanctuary, fellowship hall, offices) has never had a baseline energy audit — the first step toward the Energy petal is knowing where the load actually goes. Standard: undefined Proof: nameplate photo set + lighting inventory + 12-month usage summary + prioritized findings + GPS Method (undefined): 1. Walk the campus with facilities staff and photograph the main electrical panel, gas meter and major HVAC equipment nameplates. 2. Log lighting type/count by room and note any equipment left running unoccupied. 3. Review 12 months of utility bills with staff to establish the baseline usage. 4. Compile the ASHRAE Level 1 findings into a prioritized retrofit list. Done when: nameplate photo set + lighting inventory + 12-month usage summary + prioritized findings + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: ASHRAE Level 1 energy audit
Bring
- tablet/clipboard
- tape measure
- light meter (lighting scope)
- clamp thermometer (refrigeration scope)
- 12-month utility bills
- camera
- ladder + spotter (high fixtures)
Steps
- 1. Confirm the address; arrange a staff escort for mechanical/back-of-house.
- 2. Photograph HVAC, lighting, envelope, and any in-scope systems.
- 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition.
- 4. Summarize 12 months of utility use (kWh / therms) from the bills.
- 5. Take the in-scope measurements (light levels, unit temperatures, seal condition).
- 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic.
- 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign.
If it does not match the plan
- Knob-and-tube, ungrounded or overheated wiring, scorched outlets, or a hot electrical panel -> STOP: do not operate the circuit; route to a licensed electrician and restrict use (NEC / fire hazard).
- Gas odor, or a combustion appliance with absent/blocked venting (backdrafting / CO risk) -> STOP: evacuate, ventilate, call the gas utility. The agent escalates, never relights or adjusts gas.
- Any live-electrical/gas hazard -> document, do not touch, flag for a licensed pro.
- Refrigeration unit out of food-safe range -> flag as both energy and food-safety risk.
- Suspected asbestos/lead in materials -> flag and stop.
What counts as done
- System inventory complete for the in-scope equipment
- 12-month utility use summary recorded
- In-scope measurements recorded with units
- Ranked no-cost/low-cost + capital measure list produced
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.