Anyone can start here · Complex 4 courtyard + laundry room, 6200-6300 block of Gulfton St, Houston, TX 77081

Map the flood-drainage gaps of a second Gulfton apartment complex

A second complex on the block carries the same exposure: a courtyard that ponds ankle-deep in a hard rain and a laundry room whose floor sits below the parking-lot grade — neither has ever been mapped for the manager. Standard: FEMA floodplain + green-infrastructure siting screen; SDG 11.5 disaster resilience. Proof: photo + GPS + low-spot/drainage map + siting note Method (FEMA floodplain + green-infrastructure siting screen, ~45-90 min): 1. Confirm post-event conditions are safe; navigate to the site; record GPS. 2. Photograph deposited sediment / affected area. 3. Measure deposition depth at representative points. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values. 5. Note debris, hazards, and the extent (sketch). 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign. Equipment: GPS phone, tape/ruler for deposition depth, metals field kit (if sediment screen in scope), boots + gloves, camera Done when: Deposition depth recorded at representative points; Metals screen recorded (if in scope); Debris/hazard note + extent sketch; GPS waypoint + timestamped photos

Where
Complex 4 courtyard + laundry room, 6200-6300 block of Gulfton St, Houston, TX 77081
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo + GPS + low-spot/drainage map + siting note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.