Anyone can start here · classroom wing, Benavidez Elementary School, 6262 Gulfton St, Houston, TX 77081

Baseline the classroom-wing air quality at Benavidez Elementary

A classroom wing at this densely-attended HISD campus has no CO2/PM2.5/VOC baseline on file even though teachers have flagged stuffy afternoons; a one-pass ASHRAE 62.1-style walk gives the campus its first real number. Standard: ASHRAE 62.1 ventilation + EPA IAQ baseline (CO2, PM2.5, VOC, RH); LBC Health+Happiness petal. Proof: photo-documented CO2/PM2.5/VOC/RH readings per room + summary sheet + GPS Method (ASHRAE 62.1 + EPA IAQ / moisture baseline, ~45-90 min): 1. Confirm the room/unit and address; coordinate to sample during normal occupancy where relevant. 2. Photograph the space and any staining/damp/mold. 3. Place the monitor in the occupied zone; log CO2 over >=1 occupied hour. 4. Record PM2.5, temperature, and relative humidity. 5. For moisture/mold scope, take moisture-meter readings at affected vs baseline areas and estimate visible mold area. 6. Note ventilation type and any obvious deficiencies. 7. Enter the logs, readings, extent notes, photos into the proof record; sign. Equipment: CO2 monitor, PM2.5 monitor, temp/RH meter, moisture meter (mold/moisture scope), GPS/address, camera Done when: CO2 logged over >=1 occupied hour; PM2.5, temperature, and RH recorded; Moisture readings + visible-mold extent recorded (moisture scope); Timestamped photos + address confirm

Where
classroom wing, Benavidez Elementary School, 6262 Gulfton St, Houston, TX 77081
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo-documented CO2/PM2.5/VOC/RH readings per room + summary sheet + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: ASHRAE 62.1 + EPA IAQ / moisture baseline

Bring

Steps

  1. 1. Confirm the room/unit and address; coordinate to sample during normal occupancy where relevant.
  2. 2. Photograph the space and any staining/damp/mold.
  3. 3. Place the monitor in the occupied zone; log CO2 over >=1 occupied hour.
  4. 4. Record PM2.5, temperature, and relative humidity.
  5. 5. For moisture/mold scope, take moisture-meter readings at affected vs baseline areas and estimate visible mold area.
  6. 6. Note ventilation type and any obvious deficiencies.
  7. 7. Enter the logs, readings, extent notes, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.