intermediate work · University Blvd / Arlington Road corridor, Arlington, Jacksonville, FL 32211
Score a home's storm readiness against the FORTIFIED Home checklist, University Blvd / Arlington Road corridor
Jacksonville sits in a hurricane corridor, and most homes in this block have never been scored against the IBHS FORTIFIED Home checklist -- the ranked list of hardening steps (shutters, soffit vents, garage door, roof-to-wall connections) that keeps a roof on in a named storm. Standard: IBHS FORTIFIED Home (TM) -- Roof/Silver/Gold wind-mitigation construction standard for hurricane-prone housing (roof-to-wall connections, opening protection, soffit/vent hardening, garage-door bracing). SDG 11.b resilient housing. Proof: photo-documented checklist (exterior walk + attic-hatch entry only, no roof access) + ranked hardening list naming each follow-on job + GPS Method (IBHS FORTIFIED Home (TM) -- Roof/Silver/Gold wind-mitigation construction standard for hurricane-prone housing (roof-to-wall connections, opening protection, soffit/vent hardening, garage-door bracing). SDG 11.b resilient housing.): 1. 1. Walk the exterior at ground level with the owner and photograph every opening (windows/doors), the soffit vent line and the garage door as found. 2. 2. Enter the attic through the pull-down access hatch only (no roof access) and photograph the visible roof-to-wall and gable-end framing connections from the hatch platform. 3. 3. Score each item against the IBHS FORTIFIED Home checklist (opening protection, soffit/vent condition, garage-door bracing, roof-to-wall connectors, gable-end bracing). 4. 4. Rank the shortfalls into a sequenced hardening list naming the matching DOING job for each (shutters -> soffit vents -> garage bracing -> roof-to-wall straps -> gable bracing). 5. 5. Deliver the one-page checklist to the owner and photograph the handoff. Done when: photo-documented checklist (exterior walk + attic-hatch entry only, no roof access) + ranked hardening list naming each follow-on job + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–240 minutes. Method of record: IBHS FORTIFIED Home (TM) wind-mitigation retrofit family -- opening protection (storm shutters), soffit/vent hardening, garage-door bracing, and roof-to-wall/gable-end structural connectors for hurricane-prone housing. IBHS FORTIFIED Home Standards (Roof/Silver/Gold) + ICC-600. Ground-level, spotted-stepladder (6 ft max) or attic-hatch access only for entry/intermediate rungs; structural connector work (roof-to-wall straps, gable-end bracing) is licensed/permitted, advanced-only.
Bring
- camera
- stepladder (6 ft max) + spotter
- cordless drill/driver + fastener kit
- tape measure + level
- manufacturer/engineered spec sheet for the hardening measure installed
- gloves + safety glasses
Steps
- 1. Photograph the specific hardening item (opening, soffit vent, garage door, or attic connection) as found, and confirm the manufacturer/engineered spec (and permit, for structural connector work) for the measure being installed.
- 2. Confirm owner/occupant consent and scope; for any roof-to-wall strap or gable-end bracing work, confirm the permit and licensed-contractor assignment before starting.
- 3. Install or repair the specific FORTIFIED hardening measure per its manufacturer/engineered spec, working from ground level, a spotted stepladder (6 ft max), or the attic hatch/decking only -- never the roof edge.
- 4. Verify the installed measure meets its FORTIFIED/ICC-600 spec (seated panel, secured bracing, rated connector) and photograph the finished work from the same vantage as the before photos.
- 5. Record the hardening item completed, materials/connector spec used, and any permit/inspection reference into the proof record; sign.
If it does not match the plan
- Any item requiring roof access, scaffolding, or work above 6 ft without a spotter -> STOP: route to a licensed, credentialed crew.
- Roof-to-wall strap or gable-end bracing work always requires a permit and a licensed contractor -- never DIY regardless of skill_level.
- A damaged or non-manufacturer-spec component found during install -> document and route to the FORTIFIED evaluator/licensed contractor rather than force a fit.
What counts as done
- Before and after photos of the specific hardening item from matching vantage points
- Installed hardware matches its manufacturer/engineered wind-rating spec
- No roof-edge or unspotted-ladder work performed
- Permit/inspection reference recorded for any structural connector work (roof-to-wall straps, gable bracing)
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.