intermediate work · Middle Harbor Shoreline Park, 2777 Middle Harbor Rd, Oakland, CA 94607

Install a trash-capture device at the outfall near Middle Harbor Shoreline Park

A storm outfall feeding directly into the restored marsh at Middle Harbor Shoreline Park carries upstream litter onto the exact habitat the restoration protects. Standard: EPA green-infrastructure inspection โ€” bioretention/bioswale/permeable-pavement function + maintenance; SDG 6.3/11.5. Proof: Before photo of the bare outfall + Installation photos (device fit, anchoring) + After photo + first-storm capture check Method (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Asset type + overall condition recorded; Inlet + outlet clear/blocked status recorded; Standing-water / infiltration observation recorded; Sediment/trash level + maintenance recommendations + GPS + photos

Where
Middle Harbor Shoreline Park, 2777 Middle Harbor Rd, Oakland, CA 94607
Pay
$110 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before photo of the bare outfall + Installation photos (device fit, anchoring) + After photo + first-storm capture check

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30โ€“75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.