intermediate work · Onion Creek near the Dove Springs floodplain (Vargas Rd low-water crossing area), Austin, TX 78744

Survey flood-resilience infrastructure at Onion Creek at the Dove Springs floodplain, Onion Creek

Onion Creek at the Dove Springs floodplain sits in a documented Austin flood history (the 2013 Halloween flood on Onion Creek damaged and triggered buyouts of hundreds of Dove Springs homes); this survey documents current drainage/green-infrastructure condition against that risk. Standard: FEMA floodplain + green-infrastructure siting screen; SDG 11.5 disaster resilience Proof: drainage-feature inventory + photos + GPS Method (FEMA floodplain + green-infrastructure siting screen, ~45-90 min): 1. Confirm post-event conditions are safe; navigate to the site; record GPS. 2. Photograph deposited sediment / affected area. 3. Measure deposition depth at representative points. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values. 5. Note debris, hazards, and the extent (sketch). 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign. Equipment: GPS phone, tape/ruler for deposition depth, metals field kit (if sediment screen in scope), boots + gloves, camera Done when: Deposition depth recorded at representative points; Metals screen recorded (if in scope); Debris/hazard note + extent sketch; GPS waypoint + timestamped photos

Where
Onion Creek near the Dove Springs floodplain (Vargas Rd low-water crossing area), Austin, TX 78744
Pay
$75 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
drainage-feature inventory + photos + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.