advanced work · a family home on the Big Horn Avenue residential block, Worland, WY 82401

Replace a single-pane window, Big Horn Avenue home

The sealing and insulation work bought this home time, but its original single-pane windows are the last big heat-loss path left; a code-compliant dual-pane retrofit is the deeper fix the readiness ladder points to. Standard: Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2. Proof: U-factor spec + before/after photos + flashing/seal photos + operability + seal-check + GPS Method (Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2.): 1. Measure the rough opening and confirm the replacement unit's U-factor meets the climate-zone code minimum; photograph the existing window and any rot at the sill. 2. Remove the old sash/frame per manufacturer instructions, checking for and documenting any hidden rot or hazardous old glazing compound. 3. Set, shim, and fasten the new unit level and plumb; flash and seal per the window manufacturer's installation instructions. 4. Insulate the gap, install interior/exterior trim, and photograph the finished, operable window plus a blower-door or smoke-pencil seal check. Done when: U-factor spec + before/after photos + flashing/seal photos + operability + seal-check + GPS

Where
a family home on the Big Horn Avenue residential block, Worland, WY 82401
Pay
$210 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
U-factor spec + before/after photos + flashing/seal photos + operability + seal-check + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.