intermediate work · St. Aloysius Catholic Church, 2165 W Broad St, Columbus OH 43223
Score St. Aloysius Catholic Church's fellowship hall against the Energy petal
St. Aloysius Catholic Church has served the Hilltop since 1906, and the fellowship hall's envelope and heating system have never been scored against the Energy petal to build a sequenced retrofit plan. Standard: ASHRAE Level 1 energy audit + Living Building Challenge Energy petal screening. Proof: Completed Energy-petal checklist with photos per system + Ranked plan naming the follow-on doing jobs + Parish facilities acknowledgment photo or note Method (ASHRAE Level 1 energy audit + Living Building Challenge Energy petal screening.): 1. Walk the fellowship hall and rectory with the parish facilities contact, recording envelope condition, heating equipment age, and panel labels (photograph labels only — do not open equipment). 2. Score each system against the Energy-petal checklist (envelope, electrification, generation). 3. Rank the shortfalls into a sequenced plan naming the matching job for each (weatherstrip -> insulate -> ventilation). 4. Deliver the one-page scorecard to the parish facilities contact and photograph it handed over. Done when: Completed Energy-petal checklist with photos per system + Ranked plan naming the follow-on doing jobs + Parish facilities acknowledgment photo or note
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: ASHRAE Level 1 energy audit
Bring
- tablet/clipboard
- tape measure
- light meter (lighting scope)
- clamp thermometer (refrigeration scope)
- 12-month utility bills
- camera
- ladder + spotter (high fixtures)
Steps
- 1. Confirm the address; arrange a staff escort for mechanical/back-of-house.
- 2. Photograph HVAC, lighting, envelope, and any in-scope systems.
- 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition.
- 4. Summarize 12 months of utility use (kWh / therms) from the bills.
- 5. Take the in-scope measurements (light levels, unit temperatures, seal condition).
- 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic.
- 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign.
If it does not match the plan
- Knob-and-tube, ungrounded or overheated wiring, scorched outlets, or a hot electrical panel -> STOP: do not operate the circuit; route to a licensed electrician and restrict use (NEC / fire hazard).
- Gas odor, or a combustion appliance with absent/blocked venting (backdrafting / CO risk) -> STOP: evacuate, ventilate, call the gas utility. The agent escalates, never relights or adjusts gas.
- Any live-electrical/gas hazard -> document, do not touch, flag for a licensed pro.
- Refrigeration unit out of food-safe range -> flag as both energy and food-safety risk.
- Suspected asbestos/lead in materials -> flag and stop.
What counts as done
- System inventory complete for the in-scope equipment
- 12-month utility use summary recorded
- In-scope measurements recorded with units
- Ranked no-cost/low-cost + capital measure list produced
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.