intermediate work · First Presbyterian Church, 403 S 15th St, Worland, WY 82401

Install low-flow fixtures in the fellowship hall restrooms, First Presbyterian Church

The water audit flagged every restroom fixture running above WaterSense targets — swapping them is a one-visit fix that pays back on the church's own water and propane bill. Standard: EPA WaterSense fixture flow-rate + leak audit (indoor water conservation); SDG 6.4 water-use efficiency. Proof: before/after flow-rate readings + leak check + GPS Method (EPA WaterSense fixture flow-rate + leak audit (indoor water conservation); SDG 6.4 water-use efficiency.): 1. Photograph each flagged fixture and confirm its thread/connection type. 2. Select WaterSense-labeled replacements matched to each fixture. 3. Swap each fixture, checking for leaks at every connection. 4. Re-run the flow test on each new fixture and photograph the finished installs. Done when: before/after flow-rate readings + leak check + GPS

Where
First Presbyterian Church, 403 S 15th St, Worland, WY 82401
Pay
$75 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after flow-rate readings + leak check + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.