intermediate work · an almond orchard near Oakdale, CA 95361
Retrofit a flagged zone to drip irrigation, almond orchard near Oakdale
The catch-can audit flagged one block of this orchard running far below the distribution-uniformity target — swapping the worst emitters for pressure-compensating drip is the fix that actually gets water to the trees instead of the row middles. Standard: Mobile Irrigation Lab catch-can distribution-uniformity audit (agricultural/landscape irrigation); SDG 6.4/2.4 water-use efficiency. Proof: before/after emitter photos + spot catch-can readings + GPS Method (Mobile Irrigation Lab catch-can distribution-uniformity audit (agricultural/landscape irrigation); SDG 6.4/2.4 water-use efficiency.): 1. Confirm the flagged zone and retrofit plan against the audit report; photograph the existing emitters as found. 2. Shut down the zone and remove the underperforming emitters. 3. Install pressure-compensating drip emitters at the manufacturer-specified spacing per tree. 4. Pressurize the zone, re-run a spot catch-can check at 5+ points, and photograph the finished retrofit. Done when: before/after emitter photos + spot catch-can readings + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit
Bring
- matched catch cans (or cups)
- measuring cylinder / ruler
- pressure gauge
- stopwatch
- GPS phone
- camera
- data sheet
Steps
- 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
- 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
- 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
- 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
- 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
- 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
- 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.
If it does not match the plan
- Low-quarter DU < 0.65 (sprinkler) -> flag poor uniformity for repair/redesign.
- Visible runoff or overspray onto pavement -> flag schedule/head correction.
- Emitter clogging or line leaks (drip) -> flag maintenance.
- Broken/misaligned head -> flag for repair. Documentation only; no repairs by surveyor.
What counts as done
- Distribution uniformity (or drip emitter-flow) recorded
- Operating pressure recorded
- Broken/leaking components + overspray noted
- Schedule-vs-need note + ranked fixes + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.