advanced work · Rio de Los Angeles State Park, Cypress Park, Los Angeles, CA 90065

Extend the wetland-pond boardwalk to the overlook point, Rio de Los Angeles State Park, Cypress Park, Los Angeles, CA 90065

This park's existing viewing boardwalk stops short of the pond's best overlook point, forcing visitors to step off the structure onto bare, sensitive bank soil to see the water; extending the boardwalk's structural decking to reach the overlook keeps foot traffic entirely off the wetland substrate. Standard: US EPA National Wetland Condition Assessment rapid method; SDG 6.6/15.1 Proof: permit/park authorization + before/after photos + footing/piling depth log + structural-connection/level check + weight-load test + GPS Method (EPA National Wetland Condition Assessment (rapid method), ~45-90 min): 1. Navigate to the wetland edge; record GPS; stay on stable ground. 2. Photograph 3 quadrat stations. 3. At each station, estimate percent cover native vs invasive; identify the dominant invasive. 4. Note hydrology / water level and any disturbance. 5. Enter cover percentages, invasive ID, hydrology, GPS, photos into the proof record; sign. Equipment: GPS phone, quadrat frame, invasive-species ID reference, boots, insect protection, camera Done when: Percent cover native vs invasive recorded at 3 stations; Dominant invasive species identified; Hydrology / water-level note recorded; GPS waypoints + quadrat photos

Where
Rio de Los Angeles State Park, Cypress Park, Los Angeles, CA 90065
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit/park authorization + before/after photos + footing/piling depth log + structural-connection/level check + weight-load test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA National Wetland Condition Assessment (rapid method)

Bring

Steps

  1. 1. Navigate to the wetland edge; record GPS; stay on stable ground.
  2. 2. Photograph 3 quadrat stations.
  3. 3. At each station, estimate percent cover native vs invasive; identify the dominant invasive.
  4. 4. Note hydrology / water level and any disturbance.
  5. 5. Enter cover percentages, invasive ID, hydrology, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.