Anyone can start here · the community garden lot on Baltic Ave, Wrigley neighborhood, Long Beach, CA 90806

Seed a cover crop on the fallow rows at the Baltic Ave community garden, Wrigley (2026-07-17)

Fallow rows at the Baltic Ave garden sit bare between plantings, losing structure to compaction and rain. A seeded cover crop is the soil-building DOING step USDA NRCS CPS 340 names for exactly this gap. Standard: Cover crop establishment — USDA NRCS Conservation Practice Standard 340; soil-building DOING under the VM0042 MRV path. SDG 15. Proof: before/after photos + seed mix/rate log + GPS Method (Cover crop establishment — USDA NRCS Conservation Practice Standard 340; soil-building DOING under the VM0042 MRV path. SDG 15.): 1. Photograph the bare fallow row as found. 2. Broadcast a cover-crop seed mix suited to the season (legume/grass blend) at the recommended rate. 3. Rake in lightly and water to establish. 4. Photograph the seeded row and log the seed mix and rate used. Done when: before/after photos + seed mix/rate log + GPS

Where
the community garden lot on Baltic Ave, Wrigley neighborhood, Long Beach, CA 90806
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + seed mix/rate log + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 120–480 minutes. Method of record: Cover crop establishment per NRCS Conservation Practice Standard 340 (species mix, seeding rate/date/depth for the site) — soil-building DOING under the VM0042 soil-carbon MRV path; assess→seed→verify

Bring

Steps

  1. 1. ASSESS: photograph the field/plot as found (bare soil, crusting, erosion rills), record GPS boundaries and area, and confirm the seed mix + rate + seeding window against the NRCS 340 job sheet for the site.
  2. 2. Prepare the seedbed minimally (rake/harrow surface crust; no deep tillage) and broadcast or drill the mix at the planned rate and depth.
  3. 3. Ensure seed-to-soil contact (cultipack/rake-in) and apply establishment water if the plan calls for it.
  4. 4. Mark/photograph the seeded boundary and log the seeding date, mix, and rate as the establishment record.
  5. 5. VERIFY: return at the plan's check window (10–21 days) and photograph emergence across ≥3 representative spots; log estimated ground-cover percent and reseed thin patches per the job sheet.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.