intermediate work · Anaheim St, Cambodia Town, Long Beach, CA 90804

Set up a shared compost hub for the restaurant corridor, the Cambodia Town restaurant corridor on Anaheim St (2026-07-17)

Several kitchens along the corridor share an alley but no shared compost system — a block-scale hub diverts far more than any one kitchen's small bin. Standard: Compost application — USDA NRCS CPS 336 / CDFA Healthy Soils quantification; finished compost only. SDG 15. Proof: before/after site photos + signage photo + first-batch log + GPS Method (Compost application — USDA NRCS CPS 336 / CDFA Healthy Soils quantification; finished compost only. SDG 15.): 1. Site the shared bin in the alley with the participating owners: shaded, drained, away from doors; photograph the site before. 2. Assemble a rodent-resistant multi-stage bin system and post simple what-goes-in signage in English and Khmer. 3. Charge the first batch: layered greens/browns, moisture-checked. 4. Walk each kitchen's staff through the routine and photograph the finished setup. Done when: before/after site photos + signage photo + first-batch log + GPS

Where
Anaheim St, Cambodia Town, Long Beach, CA 90804
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after site photos + signage photo + first-batch log + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.