Replace the fellowship-hall gas furnace with a heat pump, First Congregational Church of Long Beach

The fellowship hall's gas furnace burns fossil fuel for every community meal and service; a right-sized heat pump is the Energy-Petal repair, and it cools the hall too for summer gatherings. Standard: Heat-pump HVAC replacement — ACCA Manual J/S sizing, manufacturer + local mechanical/electrical permits (LBC Energy petal). SDG 7. Proof: permit + commissioning sheet + before/after photos + inspection result + GPS Method (Heat-pump HVAC replacement — ACCA Manual J/S sizing, manufacturer + local mechanical/electrical permits (LBC Energy petal). SDG 7.): 1. Verify the Manual J/S sizing against the hall and photograph the existing furnace and nameplates; confirm the permit and electrical capacity before work. 2. Recover refrigerant from the old unit per EPA 608 and remove it for documented disposal. 3. Set the new heat pump, run the line set, pull vacuum to spec and charge per manufacturer; a licensed electrician lands the circuit and disconnect. 4. Commission: verify charge, airflow, heating/cooling delta-T and condensate. 5. Pass the mechanical/electrical inspection and photograph the commissioning readings and finished installation. Done when: permit + commissioning sheet + before/after photos + inspection result + GPS

Where
241 Cedar Ave, First Congregational Church of Long Beach, CA 90802
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit + commissioning sheet + before/after photos + inspection result + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 360–720 minutes. Method of record: Heat-pump HVAC replacement sized by ACCA Manual J/S, installed per manufacturer + local mechanical/electrical permits (ENERGY STAR cold-climate list where applicable) — licensed crew; assess→install→verify

Bring

Steps

  1. 1. ASSESS: verify the Manual J/S sizing against the home (envelope, ductwork or head locations), confirm electrical capacity for the new circuit, and photograph the existing system and nameplates.
  2. 2. Decommission and recover refrigerant from the old system per EPA 608; remove equipment for lawful disposal/recycling and document it.
  3. 3. Set and mount the new equipment, run and braze/flare the line set, pull vacuum to spec, and release/weigh in charge per manufacturer; a licensed electrician lands the new circuit and disconnect.
  4. 4. Commission: verify airflow, refrigerant charge (subcooling/superheat per spec), heating and cooling delta-T, and condensate drainage; set up controls/thermostat.
  5. 5. VERIFY: pass the mechanical/electrical inspection; record commissioning numbers and before/after photos; leave the owner the manual, warranty registration, and maintenance schedule.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.