Build a downspout-fed rain garden in the parking lot, First Congregational Church of Long Beach
First Congregational Church of Long Beach's parking-lot downspouts dump straight onto pavement and into the storm system. A planted rain garden at the low point captures that runoff instead of wasting it. Standard: EPA green-infrastructure inspection — bioretention/bioswale/permeable-pavement function + maintenance; SDG 6.3/11.5. Proof: before/after photos + basin sizing note + planting list + GPS Method (EPA green-infrastructure inspection — bioretention/bioswale/permeable-pavement function + maintenance; SDG 6.3/11.5.): 1. Photograph the downspout discharge point and the low spot in the lot/landscape it drains to. 2. Dig a shallow basin sized to the downspout's contributing roof area, keeping it at least 10 feet from the foundation. 3. Amend the basin soil for infiltration and plant native, water-tolerant species. 4. Route the downspout to the basin, mulch, and photograph the finished rain garden. Done when: before/after photos + basin sizing note + planting list + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.