advanced work · a working ranch parcel off US-16 (Ten Sleep Highway), Worland, WY 82401

Soil-health baseline across the working ranch, a working ranch parcel off US-16 (Ten Sleep Highway), Worland, WY 82401

This Washakie County ranch parcel has never had an infiltration + aggregate-stability baseline recorded across its irrigated pasture -- without it, the operator has no way to measure whether cover-crop and compost work actually improves the ground over time. Standard: USDA-NRCS infiltration + aggregate stability; SDG 15.3 LDN Proof: infiltration-test photos/video per plot + aggregate-stability photo + GPS per plot + ranked shortfall list Method (USDA-NRCS soil-health in-situ assessment, ~45-90 min): 1. Navigate to the plot; record GPS; sketch the sampling layout. 2. Photograph each sampling station. 3. Run the infiltration ring; record time to infiltrate 1 inch. 4. Assess aggregate stability and note visible organic matter, roots, and biology. 5. If compaction is in scope, record penetrometer resistance by depth. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign. Equipment: soil auger or trowel, infiltration ring + measured water + timer, penetrometer (if compaction in scope), clean bucket, sample bags + labels, gloves, GPS phone, camera Done when: Infiltration time recorded; Aggregate stability + organic-matter observation recorded; Each in-scope measurement recorded with units and depth; GPS waypoint + station photos + site sketch

Where
a working ranch parcel off US-16 (Ten Sleep Highway), Worland, WY 82401
Pay
$110 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
infiltration-test photos/video per plot + aggregate-stability photo + GPS per plot + ranked shortfall list

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.