Anyone can start here · the sidewalk frontage along E Weldon Ave near N Wishon Ave, Tower District, Fresno, CA 93728

Remove the graffiti and scrub the sidewalk frontage on the sidewalk frontage along E Weldon Ave near N Wishon Ave, Tower District (2026-07-17)

Tagged surfaces and a grime-caked sidewalk frontage along the sidewalk frontage along E Weldon Ave near N Wishon Ave make the corner feel abandoned even where the shops next to it are open; removing the paint and scrubbing the concrete restores the block's everyday dignity. Standard: undefined Proof: before/after photos same vantage + product used + runoff-disposal confirmation + GPS Method (undefined): 1. Photograph the tagged surfaces and dirty sidewalk as found. 2. Apply an eco-safe, biodegradable graffiti remover per the label and scrub with a stiff brush; no solvent-based stripper, no power washer near traffic or pedestrians. 3. Rinse and sweep the water and residue to a drain-safe disposal method; never let graffiti-remover runoff drain straight into a street storm inlet. 4. Photograph the cleaned surface from the same vantage. Done when: before/after photos same vantage + product used + runoff-disposal confirmation + GPS

Where
the sidewalk frontage along E Weldon Ave near N Wishon Ave, Tower District, Fresno, CA 93728
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos same vantage + product used + runoff-disposal confirmation + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Community-coordination hazard survey (documentation + coordination only; severity-tagged)

Bring

Steps

  1. 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard.
  2. 2. Photograph each hazard.
  3. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical).
  4. 4. Name the responsible handoff target (BID / city agency / utility).
  5. 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.