Repair a heaved sidewalk panel with a permeable finish, St. Ann's Avenue block

Root-heaved, cracked sidewalk panels on St. Ann's Avenue block trip people daily and shed every drop of rain to the gutter. Repairing to ADA grade with a permeable finish fixes the fall hazard and turns the surface into infiltration. Standard: ADA + PROWAG (36 CFR 1190) — accessible public rights-of-way (R302); EPA permeable pavement BMP. Proof: permit + before/after photos + level readings + infiltration water-test video + GPS Method (ADA + PROWAG (36 CFR 1190) — accessible public rights-of-way (R302); EPA permeable pavement BMP.): 1. Measure and photograph the failed panel (lift height, cross-slope, ponding); confirm the right-of-way permit and 811 utility locates before cutting. 2. Set cones/barricades and a pedestrian detour; all work stays out of the traffic lane. 3. Remove the failed section using wet-cut dust controls; correct the subgrade or root cause (root-prune only per the city arborist standard). 4. Place open-graded base and the permeable surface to ADA/PROWAG slope and lippage limits, then verify with level photos and a water-test. Done when: permit + before/after photos + level readings + infiltration water-test video + GPS

Where
Location on the packet
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit + before/after photos + level readings + infiltration water-test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 240–600 minutes. Method of record: Sidewalk panel repair with permeable finish per ADA/PROWAG surface requirements + EPA permeable pavement BMP, under municipal right-of-way permit — trained crew with wet-cut dust controls; assess→repair→verify

Bring

Steps

  1. 1. ASSESS: measure and photograph each displaced/cracked panel (lift height, cross-slope, ponding), mark the repair extent, and confirm the right-of-way permit and utility locates (811) before any cutting.
  2. 2. Set up cones/barricades and a safe pedestrian detour; keep all work out of the traffic lane.
  3. 3. Remove or wet-cut the failed section with water-fed dust controls; excavate to the design subbase and correct the root or subgrade cause (root-prune only per the city arborist standard).
  4. 4. Place open-graded base and the permeable surface (pavers or pervious mix) to ADA/PROWAG slope and lippage limits; compact and edge.
  5. 5. VERIFY: check cross-slope ≤2% and vertical discontinuity ≤1/4 inch, water-test infiltration, photograph before/after from the same vantage, and close out the permit.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.