intermediate work · Location on the packet

Clear and check the storm-drain inlets on Cypress Avenue block (2026-07-17)

The curb inlets on Cypress Avenue block clog with leaves and litter every season, so runoff ponds at the corners and carries the block's trash toward the Bronx River/Harlem River watershed. Standard: EPA NPDES MS4 stormwater program — municipal BMP maintenance (inlet cleaning). Proof: before/after photo pairs per inlet + water-flow video + disposal photo + GPS Method (EPA NPDES MS4 stormwater program — municipal BMP maintenance (inlet cleaning).): 1. Photograph each inlet as found (grate, apron, gutter approach) and record GPS. 2. Set cones at the curb work zone; work from the sidewalk/curb only — never enter, reach into, or open the drain structure. 3. Clear debris and litter from the grate surface and gutter approach with rake/grabber; bag it with green waste separated. 4. Photograph the cleared inlet from matching vantage, pour a bucket of clean water to show flow, and report any damage to the MS4/311 line. Done when: before/after photo pairs per inlet + water-flow video + disposal photo + GPS

Where
Location on the packet
Pay
$55 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photo pairs per inlet + water-flow video + disposal photo + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: Storm drain inlet surface cleaning + minor grate/apron repair per EPA MS4 stormwater BMP maintenance — SURFACE WORK FROM THE CURB ONLY; never enter the drain, never lift beyond the grate; assess→clear/repair→verify

Bring

Steps

  1. 1. ASSESS: photograph the inlet as found (grate, apron, gutter approach), note blockage type and any damage (broken grate, displaced apron concrete), and record GPS.
  2. 2. Set cones at the curb work zone; all work is from the sidewalk/curb — never step into the traffic lane and never enter, reach into, or open the drain structure.
  3. 3. Clear debris, sediment, and litter from the grate surface and the gutter approach with the rake/grabber; bag and dispose of it properly (green waste separated).
  4. 4. Minor repair within surface scope: re-seat a displaced grate that lifts freely by hand from above, patch apron spalls with cold-patch where the city standard allows; anything more is documented, not attempted.
  5. 5. VERIFY: photograph the cleared inlet from the same vantage, pour a bucket of clean water at the gutter approach to show flow into the inlet, and report any structural damage to the municipal stormwater line (311/MS4 contact) with photos.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.