intermediate work · Location on the packet

Fit a catch-basin filter insert at a storm drain feeding the Harlem River waterfront

A curb inlet feeding directly into the Harlem River waterfront passes every bit of street trash and oil sheen straight through with no filtration at all. Standard: EPA Green Infrastructure BMP; SDG 6.6/11.b. Proof: before/after photos + insert model/size documentation + maintenance schedule + GPS Method (EPA Green Infrastructure BMP; SDG 6.6/11.b.): 1. Photograph the inlet as found and confirm the insert's size matches the catch-basin opening. 2. Set cones at the curb work zone; work from the sidewalk/curb only โ€” never enter or reach into the drain structure. 3. Fit the filter insert into the catch-basin frame per manufacturer spec, securing it against dislodgement. 4. Photograph the installed insert and log the maintenance-check schedule for future cleanouts. Done when: before/after photos + insert model/size documentation + maintenance schedule + GPS

Where
Location on the packet
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + insert model/size documentation + maintenance schedule + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30โ€“75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.