intermediate work · 2800-2900 block of Dr. Andrew J. Brown Avenue, Martindale-Brightwood, Indianapolis, IN 46218

Protect the exposed plumbing from freezing on Dr. Andrew J. Brown Avenue

An exposed supply line in an unheated crawlspace or rim area on Dr. Andrew J. Brown Avenue has no protection against an Indianapolis cold snap -- a split pipe mid-winter floods the space it was meant to serve. Heat tape and insulation sleeving now prevents that call. Standard: Cold-climate building-envelope weatherization INSTALL (DOE Weatherization Assistance Program install practice + BPI combustion-safety-first sequencing) -- storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection. The hands-on DOING sibling of the weatherization_readiness survey. LBC Energy Petal. SDG 7. Proof: before/after photos + heat-tape UL listing photo + GPS Method (Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify, ~60-150 min): 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target. Equipment: caulk gun + backer rod, low-expansion spray-foam sealant (fire-rated where required), storm window/door kit or rigid-foam rim-joist batts, heat-tape + pipe-insulation sleeves (freeze-protection runs), camera, tape measure + utility knife Done when: Before photo of the untreated bypass/window/rim-joist/pipe run; After photo from matching vantage showing the completed seal, insulation or install; Seal or fit verified (smoke-pencil, lock-and-latch, or continuous-coverage check) and recorded; Any combustion-safety or moisture flag surfaced during install routed to a BPI-qualified pro

Where
2800-2900 block of Dr. Andrew J. Brown Avenue, Martindale-Brightwood, Indianapolis, IN 46218
Pay
$75 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + heat-tape UL listing photo + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–150 minutes. Method of record: Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify

Bring

Steps

  1. 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
  2. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
  3. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
  4. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
  5. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.