intermediate work · the 8th Ave S residential blocks near the South Park Community Center, Seattle, WA 98108

Dry out and source-repair a damp crawlspace or wall base on the 8th Ave S residential blocks near the South Park Community Center, Seattle, WA 98108

With the gutters now draining correctly, the next honest step is the moisture this block's homes already collected — damp crawlspace soil, staining at the sill plate — before it becomes the mold call nobody wants to make. Standard: Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2. Proof: before/after photos + source-fix documentation + drying log + GPS Method (Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2.): 1. Photograph the damp area (crawlspace soil, sill-plate staining, musty odor location) and check for an active leak vs standing groundwater. 2. Fix the identified water source: reroute a downspout, regrade a low spot away from the foundation, or seal an obvious gap — hand tools only. 3. Run a fan or dehumidifier to actively dry the area over the visit; wipe down any surface mildew with a mild detergent solution (no bleach fogging). 4. Photograph the dried, source-corrected area and log the moisture-meter reading before and after if a meter is available. Done when: before/after photos + source-fix documentation + drying log + GPS

Where
the 8th Ave S residential blocks near the South Park Community Center, Seattle, WA 98108
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + source-fix documentation + drying log + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.