intermediate work · the Duwamish River dry bank near the South Park Bridge (14th Ave S), South Park, Seattle, WA 98108
Install erosion-control matting on the Duwamish dry bank, the Duwamish River dry bank near the South Park Bridge (14th Ave S), South Park, Seattle, WA 98108
With the litter cleared, this stretch of bare upland bank sheds soil into the river with every rain; a staked coir matting keeps the slope in place while the planting below takes root. Standard: Community-stewardship practices consistent with the EPA Region 10 Lower Duwamish Waterway Superfund cleanup (listed 2001; sediment cleanup ongoing under EPA/Washington Ecology oversight) — upland shoreline habitat restoration, litter and pollution-vector reduction, and safe public river access on the DRY BANK ONLY (never sediment or in-water contact, which routes to the licensed EPA-overseen cleanup contractor). SDG 6.6 + SDG 11 (South Park is an EPA-designated overburdened/environmental-justice community) + SDG 14. Proof: before/after photos + square-footage log + stake-spacing photo + GPS Method (Community-stewardship practices consistent with the EPA Region 10 Lower Duwamish Waterway Superfund cleanup (listed 2001; sediment cleanup ongoing under EPA/Washington Ecology oversight) — upland shoreline habitat restoration, litter and pollution-vector reduction, and safe public river access on the DRY BANK ONLY (never sediment or in-water contact, which routes to the licensed EPA-overseen cleanup contractor). SDG 6.6 + SDG 11 (South Park is an EPA-designated overburdened/environmental-justice community) + SDG 14.): 1. Photograph the bare, eroding bank slope as found, staying on dry upland ground. 2. Lightly rake the surface by hand to key the matting in — no digging or excavation. 3. Roll out biodegradable coir erosion-control matting overlapping seams upslope-over-downslope, and stake it every 2–3 feet with wood or biodegradable stakes. 4. Photograph the finished, staked matting from matching vantage and log the square footage covered. Done when: before/after photos + square-footage log + stake-spacing photo + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–180 minutes. Method of record: Lower Duwamish Waterway Superfund dry-bank shoreline stewardship — upland litter/debris removal, erosion-control matting, native upland planting, and ADA access-path maintenance, strictly on the DRY UPLAND BANK (never sediment or in-water contact, which routes to the EPA-overseen cleanup contractor). EPA Region 10 LDW community-involvement practice. SDG 6.6 / 11 / 14. assess->clear/stabilize/plant->verify
Bring
- grabber tool + trash bags (litter removal)
- biodegradable coir matting + wood/biodegradable stakes (erosion control)
- trowel/shovel + native upland plant or seed stock (planting)
- rake + tamper (access-path surface maintenance)
- camera + GPS
Steps
- 1. ASSESS: photograph the dry upland bank/path section as found, and confirm the entire work area is above the wrack line — never below it, never in water or exposed sediment.
- 2. Clear litter and debris by hand/grabber tool, bagging material and separating recyclables; report (do not collect) any drum, needle or unknown hazardous container.
- 3. Where the bank is bare or eroding, key the surface lightly by hand (no digging deeper than 2 in) and install staked coir erosion-control matting; where the site calls for planting, plant native upland species and water in from the dry bank.
- 4. Where the work is access-path maintenance, regrade and compact the existing dry path surface to a stable, ADA-consistent grade.
- 5. VERIFY: photograph the finished section from matching vantage, log the practice performed (bag count / sq ft matted / species planted / path length), and confirm no step of the work crossed the wrack line into sediment or water.
If it does not match the plan
- Any part of the task would require entering water, mud, or exposed sediment -> STOP, this is the licensed EPA-overseen cleanup contractor's task, document only.
- An unknown drum, sheen, or odor is present -> stop, do not touch, photograph from a safe distance and report to the MS4/311 or EPA site line.
- The bank slope or footing is unsafe for the planned work -> stop and document instead of proceeding.
What counts as done
- Before/after photo pairs of the worked dry-bank section
- Quantity log matched to the specific practice (bags, sq ft, species/count, or path length)
- Photo confirmation the work stayed above the wrack line, never in sediment or water
- Any hazardous or unknown item documented and reported, never collected
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.