Build the entry ramp named by the readiness walk, Home on Meade St (1200 block), Westwood

The readiness walk above named the front-step threshold as the block point between this resident and their own front door; a code-compliant ramp is what turns that finding into a doing job someone can actually finish. Standard: Aging-in-place / accessibility retrofit plan — the survey that lets a person stay in the home they love safely: fall-hazard walkthrough (CDC STEADI home checklist), room-by-room accessibility measurements against ICC/ANSI A117.1 dimensional references, daily-routine mapping with the occupant, and a prioritized retrofit plan (grab bars, lighting, thresholds, ramps, first-floor living feasibility) with funding paths (Older Americans Act / USDA 504 / state programs). NAHB CAPS (Certified Aging-in-Place Specialist) practice under the LBC Equity petal. Observation/planning only — structural, electrical, and ramp/load work route to licensed contractors; medical equipment and care needs route to the occupant's clinician/OT; SDG 3.8/11.1. Proof: before/after photos + slope/landing/handrail measurements + GPS Method (Aging-in-place / accessibility retrofit plan — the survey that lets a person stay in the home they love safely: fall-hazard walkthrough (CDC STEADI home checklist), room-by-room accessibility measurements against ICC/ANSI A117.1 dimensional references, daily-routine mapping with the occupant, and a prioritized retrofit plan (grab bars, lighting, thresholds, ramps, first-floor living feasibility) with funding paths (Older Americans Act / USDA 504 / state programs). NAHB CAPS (Certified Aging-in-Place Specialist) practice under the LBC Equity petal. Observation/planning only — structural, electrical, and ramp/load work route to licensed contractors; medical equipment and care needs route to the occupant's clinician/OT; SDG 3.8/11.1.): 1. Confirm the ramp run/rise ratio (1:12 max) and landing dimensions against ICC/ANSI A117.1 for the specific threshold; photograph the entry as found. 2. Set footings or a compliant modular ramp base level and secure to the structure per the plan. 3. Build the ramp deck and handrails to code height with a non-slip surface. 4. Verify slope, landing size and handrail height with a level and tape, and photograph the finished ramp with the occupant using it. Done when: before/after photos + slope/landing/handrail measurements + GPS

Where
1200 Meade St, Westwood, Denver, CO 80219
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + slope/landing/handrail measurements + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Aging-in-place retrofit survey (NAHB CAPS practice + CDC STEADI home fall-hazard checklist + ICC/ANSI A117.1 dimensional references; LBC Equity petal; observation/planning only)

Bring

Steps

  1. 1. Walk the occupant's actual day with them: wake, bathroom, kitchen, mail, laundry, favorite chair, bed. Record where they hesitate, grab, or avoid — the retrofit plan serves this routine, not a generic checklist. Their claim is simple: to stay in this home, safely.
  2. 2. Run the fall-hazard walkthrough (CDC STEADI home checklist): loose rugs and cords, stair condition + handrails both sides, tub/shower entry, toilet height, night path from bed to bathroom; photograph each hazard.
  3. 3. Measure the home against ICC/ANSI A117.1 references: doorway and hall clear widths, threshold heights, one-zero-step entry feasibility, bathroom clearances and reinforcement-ready walls for grab bars, kitchen reach zones; measure the light level on night paths and task areas.
  4. 4. Assess first-floor-living feasibility honestly: could a bedroom + full bath + laundry work on the entry level, and what would each move require (and which require a licensed contractor or structural review)?
  5. 5. Build the prioritized retrofit plan: immediate zero-construction wins (rug/cord/lighting/night-light changes), quick installs (grab bars into solid blocking, handrails, lever handles, threshold ramps), and contractor-scale items (bath reconfiguration, ramp with proper slope ~1:12, door widening) — each cost-banded, with funding paths (OAA/USDA-504/state) the household may qualify for.
  6. 6. Review the plan with the occupant and any family/caregiver they choose; enter photos, GPS/address, measurements, the routine map, and the ranked plan; sign. Real (their day, measured), Proven (photo+GPS+signature), One-of-one (this person, this home). Route care/equipment questions to their clinician/OT and structural/electrical work to licensed contractors.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.