intermediate work · 1300 block of V Street SE, Anacostia, Washington, DC 20020

Repoint the crumbling areaway retaining wall at a rowhouse on the 1300 block of V Street SE, Anacostia, Washington, DC 20020

The low brick retaining wall lining the areaway at this rowhouse on the 1300 block of V Street SE, Anacostia, Washington, DC 20020 has mortar joints eroded down to sand from a century of splashback and freeze-thaw — the same water-intrusion first aid a stoop or facade needs, applied to the wall that lines the entry well. Standard: Ground-level mortar-joint repointing on a rowhouse brick facade or water table, per NPS Preservation Brief 2 (Repointing Mortar Joints in Historic Masonry Buildings). Proof: before/after photos + mortar-mix note + GPS Method (Ground-level mortar-joint repointing on a rowhouse brick facade or water table, per NPS Preservation Brief 2 (Repointing Mortar Joints in Historic Masonry Buildings), ~90-180 min): 1. ASSESS: photograph the failing joints and measure the extent; confirm the work is reachable from the ground or a short step stool (no scaffold, no work above 6 ft) and that the mortar type is compatible with the original masonry (avoid hard portland-cement mortar on soft historic brick). 2. Rake out the failed mortar to a consistent depth (roughly 2-2.5x the joint width) without damaging the brick edges; brush and dampen the joint. 3. Pack and tool the matched mortar into the joint in lifts, matching the original joint profile and color. 4. Cure per spec (mist and protect from rapid drying) and photograph the finished joints from the same before vantage. Equipment: masonry chisel + hammer or grinder with dust-control shroud (joint raking), mortar matched to the original mix/color + pointing trowel + tuck pointer, water brush + mixing bucket, camera + tape measure Done when: Repointed joints match the original profile, width and (as closely as sourced) color; No hard/incompatible mortar used on historic soft brick; Before/after photos from a matching vantage; Work stayed at or below reachable ground-level height — no scaffold used

Where
1300 block of V Street SE, Anacostia, Washington, DC 20020
Pay
$150 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + mortar-mix note + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–180 minutes. Method of record: Ground-level mortar-joint repointing on a rowhouse brick facade or water table, per NPS Preservation Brief 2 (Repointing Mortar Joints in Historic Masonry Buildings)

Bring

Steps

  1. 1. ASSESS: photograph the failing joints and measure the extent; confirm the work is reachable from the ground or a short step stool (no scaffold, no work above 6 ft) and that the mortar type is compatible with the original masonry (avoid hard portland-cement mortar on soft historic brick).
  2. 2. Rake out the failed mortar to a consistent depth (roughly 2-2.5x the joint width) without damaging the brick edges; brush and dampen the joint.
  3. 3. Pack and tool the matched mortar into the joint in lifts, matching the original joint profile and color.
  4. 4. Cure per spec (mist and protect from rapid drying) and photograph the finished joints from the same before vantage.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.