intermediate work · 1300 block of V Street SE, Anacostia, Washington, DC 20020

Regrade and waterproof a still-flooding basement areaway at a rowhouse on the 1300 block of V Street SE, Anacostia, Washington, DC 20020

The drain-clear job at this rowhouse on the 1300 block of V Street SE, Anacostia, Washington, DC 20020 found the areaway still ponds with a clear drain — the floor itself slopes the wrong way and the wall face is bare masonry soaking up every rain. Regrading the floor and coating the wall stops the seepage at the source. Standard: Intermediate repair of a rowhouse areaway that keeps flooding after drain clearing — regrading the areaway floor to positive drainage and applying a waterproof coating to the below-grade wall face, ground-level work only (no excavation beyond the areaway's existing floor). Proof: before/after photos + slope measurement + water-test + GPS Method (Rowhouse areaway regrade + waterproof coating — intermediate ground-level masonry/drainage repair, no excavation below the existing areaway floor, ~90-180 min): 1. ASSESS: confirm via the prior drain-clear job's finding that the areaway still ponds after a clear drain; photograph the floor slope, wall face and drain location; confirm the areaway walls are sound (no active structural cracking) before regrading. 2. Regrade the areaway floor with sand/gravel fill to a positive slope toward the drain (minimum 1/4 inch per foot), tamping as you go; re-test water flow to the drain. 3. Patch any minor wall cracks with masonry compound, let cure, then apply a waterproof/damp-proofing coating to the below-grade wall face per the product's instructions. 4. Let the coating cure per spec, then photograph the finished areaway (floor slope, coated wall, clear drain) and re-run the water test showing drainage with no ponding. Equipment: masonry patch compound + trowel, waterproof/damp-proofing coating + brush or roller, sand/gravel for regrading the floor slope, camera + level + tape measure Done when: Floor slopes positively to the drain (measured, not just visual); Wall coating fully cured with no missed spots in the after photos; Water test after the work shows no standing water

Where
1300 block of V Street SE, Anacostia, Washington, DC 20020
Pay
$120 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + slope measurement + water-test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–180 minutes. Method of record: Rowhouse areaway regrade + waterproof coating — intermediate ground-level masonry/drainage repair, no excavation below the existing areaway floor

Bring

Steps

  1. 1. ASSESS: confirm via the prior drain-clear job's finding that the areaway still ponds after a clear drain; photograph the floor slope, wall face and drain location; confirm the areaway walls are sound (no active structural cracking) before regrading.
  2. 2. Regrade the areaway floor with sand/gravel fill to a positive slope toward the drain (minimum 1/4 inch per foot), tamping as you go; re-test water flow to the drain.
  3. 3. Patch any minor wall cracks with masonry compound, let cure, then apply a waterproof/damp-proofing coating to the below-grade wall face per the product's instructions.
  4. 4. Let the coating cure per spec, then photograph the finished areaway (floor slope, coated wall, clear drain) and re-run the water test showing drainage with no ponding.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.