intermediate work · 900 block of S Lauderdale St, South Memphis, Memphis, TN 38126 (residential)

Rebuild the porch railing of a shotgun house on the 900 block of S Lauderdale St, South Memphis

Loose or rotted porch railings on this block's classic shotgun-house porches are a fall risk on the exact step every visitor and resident uses daily. Standard: Repair or rebuild of a loose, rotted or missing porch/stoop guardrail or handrail to a safe, secured condition. Proof: Before photo of the loose/rotted railing; After photo of the rebuilt, secured railing; Load-test photo/video Method (Repair or rebuild of a loose, rotted or missing porch/stoop guardrail or handrail to a safe, secured condition, ~60-120 min): 1. ASSESS: photograph and test every rail section and post for looseness, rot or missing balusters; measure the gap spacing and rail height against a basic safe-guardrail reference. 2. Remove only the failed/rotted sections; probe surrounding wood to confirm sound material remains to anchor into. 3. Fit and securely fasten the replacement rail/baluster/post section, matching height and spacing to the sound sections. 4. Test the rebuilt rail by hand for rigidity at multiple points and photograph the finished, secured railing. Equipment: screwdriver/drill + deck screws or carriage bolts, replacement rail/baluster stock matched to the existing profile where possible, level + tape measure, camera Done when: Every rail section tested by hand and confirmed rigid, no looseness; Baluster/gap spacing consistent with the sound sections (no new fall-through gaps); Before/after photos of each repaired section; Fasteners appropriate to exterior/wet exposure used

Where
900 block of S Lauderdale St, South Memphis, Memphis, TN 38126 (residential)
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before photo of the loose/rotted railing; After photo of the rebuilt, secured railing; Load-test photo/video

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Repair or rebuild of a loose, rotted or missing porch/stoop guardrail or handrail to a safe, secured condition

Bring

Steps

  1. 1. ASSESS: photograph and test every rail section and post for looseness, rot or missing balusters; measure the gap spacing and rail height against a basic safe-guardrail reference.
  2. 2. Remove only the failed/rotted sections; probe surrounding wood to confirm sound material remains to anchor into.
  3. 3. Fit and securely fasten the replacement rail/baluster/post section, matching height and spacing to the sound sections.
  4. 4. Test the rebuilt rail by hand for rigidity at multiple points and photograph the finished, secured railing.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.