advanced work · the Garey Ave corridor frontage, Pomona, CA 91766

Build a rain garden in the corridor's elementary schoolyard corner, the Garey Ave corridor frontage, Pomona, CA 91766

The elementary school along this corridor sheds every drop of roof and playground runoff straight to the street with no capture at all, leaving a barren asphalt corner with no living function; a graded, planted rain garden in that corner captures the runoff and gives students a real outdoor-classroom feature. Standard: EPA GI inspection; SDG 6.3/11.5 Proof: permit/school-district authorization + before/after photos + grading/soil-mix log + native-plant list + infiltration water-test video + GPS Method (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Asset type + overall condition recorded; Inlet + outlet clear/blocked status recorded; Standing-water / infiltration observation recorded; Sediment/trash level + maintenance recommendations + GPS + photos

Where
the Garey Ave corridor frontage, Pomona, CA 91766
Pay
$145 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit/school-district authorization + before/after photos + grading/soil-mix log + native-plant list + infiltration water-test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.