advanced work · a working ranch parcel along the upper Green River, Big Piney, WY 83113

Rebuild the leaking wooden headgate on the hay-meadow irrigation ditch, a working ranch parcel along the upper Green River, Big Piney, WY 83113

This ranch's gravity-flow irrigation ditch waters the hay meadow through a decades-old wooden headgate that no longer seats tight, wasting a real share of the ranch's Green River water right to leakage before it ever reaches the field; rebuilding the gate to hold its set puts that water back where it belongs. Standard: USDA-NRCS Irrigation Water Control Structure (CPS 587) + Irrigation System, Surface and Subsurface (CPS 443); SDG 6.4 Proof: before/after photos + gate-seat/seal check + flow-set measurement + GPS Method (Mobile Irrigation Lab catch-can distribution-uniformity audit, ~60-120 min): 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro). 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can. 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths. 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks. 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement. 6. Review the run schedule against plant/soil need (over/under-watering, runoff). 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign. Equipment: matched catch cans (or cups), measuring cylinder / ruler, pressure gauge, stopwatch, GPS phone, camera, data sheet Done when: Distribution uniformity (or drip emitter-flow) recorded; Operating pressure recorded; Broken/leaking components + overspray noted; Schedule-vs-need note + ranked fixes + GPS + photos

Where
a working ranch parcel along the upper Green River, Big Piney, WY 83113
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + gate-seat/seal check + flow-set measurement + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit

Bring

Steps

  1. 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
  2. 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
  3. 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
  4. 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
  5. 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
  6. 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
  7. 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.