advanced work · 5600–5700 block of W Wilshire Blvd (public right-of-way + typical commercial conditions), Los Angeles, CA 90036

Repair a heaved sidewalk panel with a permeable finish, 5665 W Wilshire block

This block carries some of the heaviest foot traffic in Mid-Wilshire over panels heaved by decades of roots and utility cuts; every failed panel is a fall risk and a hundred percent runoff. Repair to ADA grade, finish permeable. Standard: ADA + PROWAG (36 CFR 1190) — accessible public rights-of-way (R302 pedestrian access routes, R304 curb ramps). Proof: permit + before/after level readings + infiltration test video + GPS Method (ADA + PROWAG (36 CFR 1190) — accessible public rights-of-way (R302 pedestrian access routes, R304 curb ramps).): 1. Measure and photograph each failed panel (lift, cross-slope, ponding); confirm the right-of-way permit and 811 locates before cutting. 2. Set cones/barricades and a pedestrian detour sized for commercial foot traffic; stay out of the traffic lane. 3. Remove the failed section with wet-cut dust controls; correct subgrade or root cause per the city arborist standard. 4. Place open-graded base and the permeable surface to ADA/PROWAG limits. 5. Verify slope/lippage with level photos, water-test infiltration, and close out the permit. Done when: permit + before/after level readings + infiltration test video + GPS

Where
5600–5700 block of W Wilshire Blvd (public right-of-way + typical commercial conditions), Los Angeles, CA 90036
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
permit + before/after level readings + infiltration test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 240–600 minutes. Method of record: Sidewalk panel repair with permeable finish per ADA/PROWAG surface requirements + EPA permeable pavement BMP, under municipal right-of-way permit — trained crew with wet-cut dust controls; assess→repair→verify

Bring

Steps

  1. 1. ASSESS: measure and photograph each displaced/cracked panel (lift height, cross-slope, ponding), mark the repair extent, and confirm the right-of-way permit and utility locates (811) before any cutting.
  2. 2. Set up cones/barricades and a safe pedestrian detour; keep all work out of the traffic lane.
  3. 3. Remove or wet-cut the failed section with water-fed dust controls; excavate to the design subbase and correct the root or subgrade cause (root-prune only per the city arborist standard).
  4. 4. Place open-graded base and the permeable surface (pavers or pervious mix) to ADA/PROWAG slope and lippage limits; compact and edge.
  5. 5. VERIFY: check cross-slope ≤2% and vertical discontinuity ≤1/4 inch, water-test infiltration, photograph before/after from the same vantage, and close out the permit.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.