advanced work · High-desert parcel area near Camp Rock Rd, Lucerne Valley, CA 92356

Lay out and run a one-acre restoration plot, Lucerne Valley parcel

The parcel's practices (seed cover, compost, basins, plantings) need one place where they run together under a plan with a measured before and after — the plot is where restoration stops being chores and becomes a system someone runs. Standard: UN SDG 15 — protect, restore and promote sustainable use of terrestrial ecosystems (15.3 land degradation neutrality). Proof: GPS-cornered plot + dated work plan + per-practice logs + fixed-corner before/after photo sets Method (UN SDG 15 — protect, restore and promote sustainable use of terrestrial ecosystems (15.3 land degradation neutrality).): 1. Stake the one-acre plot boundary (GPS corners) across zones representing the parcel's conditions; photograph the baseline state from fixed corners. 2. Sequence the season's practices for the plot (basins → seed cover → compost → plantings → mulch) into a dated work plan. 3. Execute or coordinate each practice in sequence, logging dates and photos per practice. 4. Maintain the plot through the season: basin repair, watering rounds, invasive pulls, all logged. 5. Photograph the plot from the fixed corners at season end against the baseline set. Done when: GPS-cornered plot + dated work plan + per-practice logs + fixed-corner before/after photo sets

Where
High-desert parcel area near Camp Rock Rd, Lucerne Valley, CA 92356
Pay
$150 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
GPS-cornered plot + dated work plan + per-practice logs + fixed-corner before/after photo sets

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: SDG 15 (Life on Land) target 15.1/15.5 — site-level terrestrial restoration: plant, tend, and record survival so the gain is measurable a year later, not just on the day

Bring

Steps

  1. 1. Photograph the site BEFORE touching anything, with GPS on and a timestamp visible.
  2. 2. Confirm you are inside the posting radius; record the waypoint.
  3. 3. Call 811 (or local utility locate) before ANY digging deeper than 30cm. Do not dig on an unlocated site.
  4. 4. Dig each hole twice the width of the root ball and no deeper — the root flare must sit level with grade, never buried.
  5. 5. Set the plant, backfill with native soil only (no fertiliser at planting), and firm gently to remove air pockets.
  6. 6. Water in immediately until the soil is saturated, roughly 10-20L per woody plant.
  7. 7. Mulch to 5cm depth, pulled back 8cm from the stem so the bark never sits wet.
  8. 8. Photograph AFTER, from the same position as the before shot, and record species, count, and spacing.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.