Anyone can start here · Our Lady of Guadalupe Catholic Church, 91st Ave (host-invited), Mecca, CA 92254
Walk the energy audit of the parish hall at Our Lady of Guadalupe in Mecca
The parish hall serves one of the largest farmworker congregations in the valley and runs its coolers all summer. A simple room-by-room audit — envelope leaks, cooler condition, lighting, shading — is the map for every improvement rung that follows. Standard: DOE small-building walk-through audit method. LBC Energy petal, SDG 7. Proof: room-by-room photo set + ranked fix list + host note Method (DOE small-building walk-through audit method. LBC Energy petal, SDG 7.): 1. With the parish host, walk every room and photograph the cooling units, lighting, and worst envelope gaps. 2. Check window orientation and existing shading; note unshaded west glass. 3. List the top ten cheapest fixes in order (seal, film, shade, cooler service). 4. Submit the photo set and ranked fix list to the host and as proof. Done when: room-by-room photo set + ranked fix list + host note
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: ASHRAE Level 1 energy audit
Bring
- tablet/clipboard
- tape measure
- light meter (lighting scope)
- clamp thermometer (refrigeration scope)
- 12-month utility bills
- camera
- ladder + spotter (high fixtures)
Steps
- 1. Confirm the address; arrange a staff escort for mechanical/back-of-house.
- 2. Photograph HVAC, lighting, envelope, and any in-scope systems.
- 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition.
- 4. Summarize 12 months of utility use (kWh / therms) from the bills.
- 5. Take the in-scope measurements (light levels, unit temperatures, seal condition).
- 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic.
- 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign.
If it does not match the plan
- Knob-and-tube, ungrounded or overheated wiring, scorched outlets, or a hot electrical panel -> STOP: do not operate the circuit; route to a licensed electrician and restrict use (NEC / fire hazard).
- Gas odor, or a combustion appliance with absent/blocked venting (backdrafting / CO risk) -> STOP: evacuate, ventilate, call the gas utility. The agent escalates, never relights or adjusts gas.
- Any live-electrical/gas hazard -> document, do not touch, flag for a licensed pro.
- Refrigeration unit out of food-safe range -> flag as both energy and food-safety risk.
- Suspected asbestos/lead in materials -> flag and stop.
What counts as done
- System inventory complete for the in-scope equipment
- 12-month utility use summary recorded
- In-scope measurements recorded with units
- Ranked no-cost/low-cost + capital measure list produced
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.