intermediate work · Dodge Park, 667 Sullivant Ave, Columbus OH 43215
Install a storm-drain trash capture device, Dodge Park
The storm inlet at the Dodge Park parking lot carries every dropped wrapper and cup straight toward the Scioto with the next rain; a catch-basin trash-capture insert intercepts it before it leaves the park. Standard: EPA green-infrastructure inspection — bioretention/bioswale/permeable-pavement function + maintenance; SDG 6.3/11.5. Proof: Before photo of the inlet + Install photos of the capture device + Finished, flush-grate photo + maintenance-check schedule logged Method (EPA green-infrastructure inspection — bioretention/bioswale/permeable-pavement function + maintenance; SDG 6.3/11.5.): 1. Photograph the inlet as found and confirm the grate size matches the capture device. 2. Lift the grate and set the capture device/insert per manufacturer instructions. 3. Reset the grate and confirm it seats flush and secure. 4. Photograph the finished install and log the maintenance-check schedule. Done when: Before photo of the inlet + Install photos of the capture device + Finished, flush-grate photo + maintenance-check schedule logged
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.