intermediate work · Longfellow Creek at Camp Long, Delridge, Seattle, WA 98106
Hand-pull invasive blackberry and ivy from the Longfellow Creek bank, Longfellow Creek at Camp Long, Delridge, Seattle, WA 98106 (2026-07-18)
Himalayan blackberry and English ivy are strangling the native understory along this stretch, shading out the streamside plants young salmon need for cover — hand-pulling before seed-set is the highest-leverage hour on the bank. Standard: Salmon-Safe certification standard (Salmon-Safe Inc., Pacific Northwest, salmonsafe.org) — urban and agricultural land-management practices (riparian buffers, pesticide-free landscaping, stormwater treatment, bank stabilization) that protect water quality and habitat for salmon and steelhead in PNW watersheds. SDG 14 (life below water) + SDG 15.1 (freshwater ecosystems) + SDG 6.6. Proof: before/after patch photos + cleared-area log + disposal photo + GPS Method (Salmon-Safe certification standard (Salmon-Safe Inc., Pacific Northwest, salmonsafe.org) — urban and agricultural land-management practices (riparian buffers, pesticide-free landscaping, stormwater treatment, bank stabilization) that protect water quality and habitat for salmon and steelhead in PNW watersheds. SDG 14 (life below water) + SDG 15.1 (freshwater ecosystems) + SDG 6.6.): 1. Photograph each infested patch as found and flag its GPS extent. 2. Hand-pull/cut invasive blackberry canes and ivy mats at the root, bagging any berries or seed heads instead of dropping them. 3. Stack cut green material as ground mulch away from the channel; haul seeded/fruiting material off-site for disposal. 4. Photograph each cleared patch from matching vantage and log the area cleared. Done when: before/after patch photos + cleared-area log + disposal photo + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–180 minutes. Method of record: Salmon-Safe urban creek/riparian bank stewardship — litter removal, hand-pulled invasive control, native riparian planting, and live-stake bank stabilization on the DRY BANK ONLY (never entering the creek channel). Salmon-Safe Inc. certification practice + King County/Adopt-A-Stream streamside restoration protocol. SDG 14 / 15.1 / 6.6. assess->clear/plant/stabilize->verify
Bring
- grabber tool + trash bags (litter removal)
- hand pruners/loppers + heavy gloves (invasive removal)
- trowel/shovel + native plant stock + mulch (riparian planting)
- mallet + dormant willow/native stake cuttings (bank stabilization)
- camera + GPS
Steps
- 1. ASSESS: photograph the bank section as found (litter, invasive cover, bare/eroding soil) and confirm the work stays entirely on dry ground above the water line.
- 2. Clear litter and debris by hand/grabber tool, and hand-pull or cut invasive vegetation at the root, bagging any seeded/fruiting material for off-site disposal.
- 3. Plant native riparian species (or drive live willow/native stakes for bank stabilization where erosion is active) at proper spacing, forming a watering basin and mulching each plant.
- 4. Deep-water each new planting from the bank with a hose or watering can, never entering the channel.
- 5. VERIFY: photograph the finished bank section from matching vantage, log species/count/bag totals, and confirm no work crossed the water line.
If it does not match the plan
- Bank slope or water level makes dry-ground footing unsafe -> STOP, document only, do not proceed.
- Invasive removal requires herbicide to be effective -> route to a licensed applicator; hand-pulling only for this posting.
- A section shows active slope failure or exposed utility -> stop and report instead of digging/staking.
What counts as done
- Before/after photo pairs of the worked bank section
- Species/count or bag-count log for the specific practice performed
- Photo confirmation that no tool, stake, or foot crossed the water line
- Any hazardous or unknown item (drum, needle) documented, not collected
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.