Anyone can start here · Invited yards, blocks near E 60th Ave & Ivy St, Commerce City, CO 80022
Document bare-soil conditions near Commerce City's industrial edge — record only
Blocks near Commerce City's industrial corridor have legacy soil questions that families deserve answers to before kids play in bare yards. The entry rung is a careful record: where bare soil is exposed, where dust tracks from, what history neighbors report — documentation that helps credentialed programs target real testing. Standard: EPA/ATSDR soil-screening program context; SDG 3 and SDG 11. Proof: Yard photo set + sketch + notes with GPS Method (EPA/ATSDR soil-screening program context; SDG 3 and SDG 11.): 1. With the occupant's invitation, photograph bare-soil areas, play areas, and dust-track paths from the yard surface. 2. Record the home's distance and direction from the industrial edge and any resident history notes. 3. Map bare versus covered ground on a simple sketch. 4. Note wind-borne dust conditions observed. 5. File photos, sketch, and notes with date and GPS. Done when: Yard photo set + sketch + notes with GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA soil screening (composite surface sample, XRF/field kit)
Bring
- trowel or auger
- clean bucket + mixing tool
- XRF analyzer or metals test kit
- PID for volatiles (if petroleum in scope)
- sample bags + labels
- N95 dust mask
- gloves + eye protection
- GPS phone
- camera
Steps
- 1. Navigate to the parcel; record GPS; sketch a >=5-point sampling grid.
- 2. Photograph each sampling point and any visible staining/fill/slag.
- 3. Collect 0-15 cm cores from >=5 points; combine and mix in the clean bucket; subsample.
- 4. Run XRF/test kit on the composite; record each metal in ppm.
- 5. If petroleum is in scope, log PID readings and any odor/staining.
- 6. Bag/label any lab subsample; complete chain-of-custody.
- 7. Enter all analytes with units, depth, GPS, photos, and site sketch into the proof record; sign.
If it does not match the plan
- Lead > 400 ppm (residential) -> tag exceedance; advise raised beds / produce-washing / cover; recommend lab confirm.
- Arsenic > site screening level or PID indicating volatiles -> tag; recommend certified-lab confirmation before reuse.
- Suspected asbestos-containing material -> do not disturb; flag and stop.
What counts as done
- >=5-point composite collected at 0-15 cm
- Each screened metal recorded in ppm
- Visible staining/fill/slag noted (or absence)
- GPS waypoint + point photos + grid sketch
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.