Anyone can start here · Public corridors near Finley Blvd, Birmingham, AL 35207

Map the illegal dumping sites along North Birmingham's corridors (2026-07-18)

Dumping concentrates where industry meets disinvestment, and North Birmingham's rail corridors and vacant frontages collect piles that no single resident can get onto the city's radar. A monthly photographed route of every active site — location, size, contents — becomes the cleanup list the next crew works from. Document and report only. Standard: Birmingham 311 blight reporting practice; SDG 11.6. Proof: Monthly route log of photographed sites Method (Birmingham 311 blight reporting practice; SDG 11.6.): 1. Walk or drive the fixed corridor route and stop at each active dump site. 2. Photograph each pile from the public way, wide and close. 3. Log location, size, and contents category — never touching or climbing the pile. 4. Submit the route report to 311 or the district contact. 5. Photograph the completed log with GPS and date. Done when: Monthly route log of photographed sites

Where
Public corridors near Finley Blvd, Birmingham, AL 35207
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Monthly route log of photographed sites

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: SDG-aligned community needs identification + intake (programmatic 311 front door) — maps a named local ecological or social need to a specific SDG target, a real place, and an actionable protocol intake, using photo + GPS + community input + a named referral target

Bring

Steps

  1. 1. Navigate to the named location; confirm GPS is inside the posting radius; record the GPS waypoint.
  2. 2. Photograph the current state of the unmet need (the gap, the condition, the absence) with a clear timestamp — the photo must show what is missing or failing, not just a streetview-style shot.
  3. 3. Document the community impact: record at minimum one household or resident account of how the need affects daily life; note the population affected (households, block, facility) and the primary harm (health risk, access barrier, safety hazard, environmental degradation).
  4. 4. Map the need to a named SDG target: record the SDG number and target (e.g. SDG 11.7, SDG 6.1, SDG 2.1, SDG 11.1) and confirm the need matches the target's scope.
  5. 5. Identify the vertical lane the work belongs to: housing (renovation/healthy-home), food (provenance/delivery), water, urban-canopy, or the appropriate ecological lane — state which existing protocol work type would provision the solution.
  6. 6. Look up and record the named intake target — the specific program, agency, or case queue the need should be routed to (e.g. city work-order URL, federal program intake, lead service line replacement registry); document the current gap between the need and the intake.
  7. 7. Compile the intake record: GPS, photos, SDG tag, community impact note, vertical lane, named intake target, and any program reference numbers; sign it as the identifying worker.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.