Anyone can start here · Occupant-invited mobile homes, Thermal & Oasis, CA 92274

Install heat-blocking window film on an invited Thermal mobile home

Eastern-valley mobile homes take the full desert sun through single-pane windows; swamp coolers can't keep up and power bills eat paychecks. Occupant-invited reflective window film on the sun-facing glass drops indoor temperature the same afternoon it goes on. Standard: DOE window-film efficiency guidance; LBC Energy petal. SDG 7. Proof: before/after per window + film-type note Method (DOE window-film efficiency guidance; LBC Energy petal. SDG 7.): 1. With the occupant, identify the south- and west-facing windows taking direct sun; photograph each before. 2. Clean the glass thoroughly; measure and cut film with the specified margins. 3. Apply with solution and squeegee per manufacturer instructions, working out bubbles. 4. Photograph each finished window and note film type and coverage. Done when: before/after per window + film-type note

Where
Occupant-invited mobile homes, Thermal & Oasis, CA 92274
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after per window + film-type note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Urban heat-island mitigation for civic hard surfaces and pedestrian waiting areas — high-solar-reflectance (cool) coatings on sidewalks/schoolyards/plazas and shade-sail/structure installs at bus stops and gathering points. EPA Heat Island Reduction Program cool-pavement guidance + ASTM E1918 solar-reflectance testing; municipal right-of-way permit where the surface or structure sits in the public way.

Bring

Steps

  1. 1. Photograph the target surface or waiting area as found, including a mid-day surface-temperature reading, and confirm the right-of-way permit and any utility locates before ground disturbance.
  2. 2. Set cones/barricades for a pedestrian-safe work zone; pressure-wash and clear the surface of debris, or confirm the shade-structure footing location clears underground utilities (811 locate) and meets the manufacturer's anchor spec.
  3. 3. Apply the cool-pavement coating system per manufacturer instructions in the specified number of coats and cure time, OR set and anchor the shade structure/sail per its engineering spec, keeping clearances for accessible passage.
  4. 4. Verify: for coatings, confirm even coverage with no missed sections and let the full cure window pass before reopening to traffic; for structures, confirm anchor torque and structural stability by hand-test.
  5. 5. Take a matching-vantage after photo and a same-conditions surface-temperature reading; log the reading delta.
  6. 6. Enter before/after photos, the temperature readings, materials/product used, and the permit reference into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.