Set up the compost system for the parish kitchen at Our Lady of Guadalupe

The parish kitchen feeds hundreds after mass and everything goes to the landfill dumpster. A rat-safe three-bin compost setup behind the hall turns that stream into soil for the parish garden beds. Standard: CalRecycle SB 1383 edible-food-recovery + composting guidance for community kitchens. SDG 12. Proof: finished-system photo + signage photo + host note Method (CalRecycle SB 1383 edible-food-recovery + composting guidance for community kitchens. SDG 12.): 1. Agree the bin location and food-scrap flow with the kitchen host. 2. Assemble a rodent-resistant three-bin or tumbler system on a level pad. 3. Post a simple what-goes-in sign in Spanish and English at the kitchen and the bins. 4. Run the first fill with the kitchen crew and photograph the working setup. Done when: finished-system photo + signage photo + host note

Where
Our Lady of Guadalupe Catholic Church, 91st Ave (host-invited), Mecca, CA 92254
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
finished-system photo + signage photo + host note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.