intermediate work · Host-invited horse properties, Muscoy, CA 92407

Set up a manure composting bay with an invited Muscoy horse keeper

Muscoy is one of the last horse-keeping neighborhoods in the basin, and manure piles wash into the storm channels every rain. A simple contained composting bay on the keeper's lot turns the pile from runoff problem into the neighborhood's best soil amendment. Standard: NRCS 317 (composting facility, small scale); SB County stormwater guidance. SDG 12/15. Proof: finished-bay photos + schedule + host note Method (NRCS 317 (composting facility, small scale); SB County stormwater guidance. SDG 12/15.): 1. Site the bay with the host on high ground away from the drainage path. 2. Build a three-sided pallet or block bay on a compacted base; cover with a tarp against rain. 3. Fork the existing pile into the bay in layers with dry carbon (straw/shavings). 4. Post a simple turn/water schedule with the host and photograph the finished bay. Done when: finished-bay photos + schedule + host note

Where
Host-invited horse properties, Muscoy, CA 92407
Pay
$75 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
finished-bay photos + schedule + host note

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.