Anyone can start here · Owner-invited single-story homes, Paradise, CA 95969
Clear the gutters and downspouts of an invited Paradise home before fire season (2026-07-18)
Needle-filled gutters are an ignition wick at the roofline. A single-story clear-out before June is among the highest-leverage hours in the town's fire calendar. Standard: CAL FIRE home-hardening checklist (roof/gutter litter). SDG 11. Proof: before/after runs + bagged-litter photo Method (CAL FIRE home-hardening checklist (roof/gutter litter). SDG 11.): 1. Photograph gutter runs as found (from the ground or a sub-6-ft step). 2. Scoop litter into bags; flush downspouts until they run clear. 3. Check splash blocks direct water away from the foundation. 4. Photograph cleared runs from matching vantage; bag waste for green collection. Done when: before/after runs + bagged-litter photo
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–150 minutes. Method of record: Exterior building-envelope maintenance for existing housing -- gutter/downspout service, exterior debris removal, small envelope patch-and-seal, and foundation-grade moisture-source control. DOE Weatherization Assistance Program DIY-safe practice (envelope-adjacent) + EPA Healthy Homes moisture-control guidance; homeowner/occupant-safe hand-tool work only.
Bring
- camera
- gutter scoop or garden-hose gutter wand + bucket/tarp
- stepladder (6 ft max) + a spotter
- caulk gun + paintable/exterior sealant + patching compound
- rake, tarp, and yard-waste bags
- tape measure + line level or 4-ft level
- gloves + safety glasses
Steps
- 1. Photograph the gutter run, downspouts, exterior debris, and any envelope gaps or grading problem as found, from the vantage points that will be used again after.
- 2. Confirm scope with the occupant/owner and confirm the home's condition (post-1978, or pre-1978 with intact/unpainted-substrate work only -- any disturbed pre-1978 paint STOPS this scope and routes to an EPA RRP lead-safe pro).
- 3. From a stepladder no taller than 6 ft with a spotter (or from the ground for single-story eaves reachable by wand/scoop), clear debris from gutters and confirm downspouts drain freely and discharge at least several feet from the foundation; re-secure any loose gutter hangers.
- 4. Clear accumulated exterior debris/junk from the immediate building perimeter, porch, and walkway so drainage paths and pest-entry points stay clear; bag/stage yard waste for pickup.
- 5. Patch and seal small envelope gaps at trim, soffit, and utility penetrations with exterior-rated caulk or patching compound, and regrade a short run of soil away from the foundation where it currently slopes toward it.
- 6. Verify: gutters run clear water end-to-end, downspouts discharge away from the foundation, patched gaps are weathertight, and the perimeter is clear; photograph the finished work from the same vantage as the before photos.
- 7. Enter before/after photos, materials used, and any hazard flagged (active leak, structural rot, suspected lead paint) into the proof record; sign.
If it does not match the plan
- Pre-1978 home with peeling/chipping/disturbed paint on the work surface -> STOP: do not scrape or sand; route to an EPA RRP lead-safe certified pro.
- Active roof or plumbing leak, sagging gutter run, or structural rot found -> document and route to a licensed contractor; this scope is maintenance and prevention, not structural repair.
- Any ladder work above 6 ft, or an eave/gutter only reachable from the roof -> STOP this entry/intermediate scope; route to a credentialed crew.
What counts as done
- Before and after photos of gutters, downspouts, envelope gaps, and the cleared perimeter from matching vantage points
- Downspouts confirmed discharging away from the foundation (not pooling at the wall)
- Patched/sealed gaps are weathertight with no exposed raw gap remaining
- Perimeter debris cleared and staged/bagged for removal
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.