intermediate work · Owner-invited yards, Iron Triangle, Richmond, CA 94801

Build the rain garden where the Iron Triangle downspout used to hit concrete

The depaved strip's next rung: shape the basin, route the downspout, plant the natives that drink the roof's winter water instead of sending it to the storm drain. Standard: Contra Costa rain-garden sizing guidance (yard scale). LBC Water petal, SDG 6. Proof: finished-garden photos + dimensions + downspout routing photo Method (Contra Costa rain-garden sizing guidance (yard scale). LBC Water petal, SDG 6.): 1. Size and shape a shallow basin in the opened ground per the roof area draining to it; keep 10 ft from the foundation. 2. Route the downspout via extension/swale into the basin with an overflow path to the original drain. 3. Plant the basin with the regional native palette (rushes, sedges, yarrow); mulch. 4. Water in, photograph finished from matching vantage, and log basin dimensions. Done when: finished-garden photos + dimensions + downspout routing photo

Where
Owner-invited yards, Iron Triangle, Richmond, CA 94801
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
finished-garden photos + dimensions + downspout routing photo

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.