intermediate work · Community gardens (host-invited), E Alisal St corridor, Salinas, CA 93905
Convert an Alisal community-garden section from hose to drip
The Alisal's community gardens water by hand in a town where water bills bite; a drip conversion on the shared spigot keeps beds alive between family visits and cuts the garden's water bill for good. Standard: EPA WaterSense micro-irrigation; UC ANR drip guidance. LBC Water petal, SDG 6. Proof: running-system photos + sketch + timer note Method (EPA WaterSense micro-irrigation; UC ANR drip guidance. LBC Water petal, SDG 6.): 1. Map the section and spigot with the host; sketch the layout. 2. Install backflow preventer, filter, regulator, mainline; run tape/emitters per bed. 3. Flush and test even flow at every bed. 4. Set the timer with the host; photograph running system; leave the sketch. Done when: running-system photos + sketch + timer note
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit
Bring
- matched catch cans (or cups)
- measuring cylinder / ruler
- pressure gauge
- stopwatch
- GPS phone
- camera
- data sheet
Steps
- 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
- 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
- 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
- 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
- 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
- 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
- 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.
If it does not match the plan
- Low-quarter DU < 0.65 (sprinkler) -> flag poor uniformity for repair/redesign.
- Visible runoff or overspray onto pavement -> flag schedule/head correction.
- Emitter clogging or line leaks (drip) -> flag maintenance.
- Broken/misaligned head -> flag for repair. Documentation only; no repairs by surveyor.
What counts as done
- Distribution uniformity (or drip emitter-flow) recorded
- Operating pressure recorded
- Broken/leaking components + overspray noted
- Schedule-vs-need note + ranked fixes + GPS + photos
Proof is measured against these, not judged by taste.