intermediate work · Public corridor, Harper Avenue between Chalmers St and Cadieux Rd, Detroit, MI 48213
Clear the mapped dumping piles from a Detroit east side corridor (2026-07-18)
Once dumping piles are mapped, someone still has to move them — and every week a pile stands, it grows. This packet clears the surveyed, non-hazardous piles from the corridor and stages them for legal bulk pickup, closing the loop the survey opened. Standard: City of Detroit bulk collection rules; SDG 11 Sustainable Cities and Communities. Proof: Before/after per pile plus staged-load photos Method (City of Detroit bulk collection rules; SDG 11 Sustainable Cities and Communities.): 1. Start from the current dumping survey list for the corridor and plan the pickup staging points. 2. Clear each non-hazardous pile: bag loose material, stack bulk items, and separate tires. 3. Stage everything at the legal bulk collection point per city rules. 4. Skip and photograph any pile with drums, tanks, or unknown containers for the credentialed crew. 5. Photograph each cleared site before and after with GPS and date on and record the load counts. Done when: Before/after per pile plus staged-load photos
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: SDG-aligned community needs identification + intake (programmatic 311 front door) — maps a named local ecological or social need to a specific SDG target, a real place, and an actionable protocol intake, using photo + GPS + community input + a named referral target
Bring
- GPS-capable phone (GPS waypoint + photos required)
- note-taking app or paper for community impact statements
- camera (photo documentation of the unmet need)
- internet access for the named program / intake lookup (city portal, USDA atlas, state database)
- copy of the posted intake criteria (SDG, lane, named intake target)
Steps
- 1. Navigate to the named location; confirm GPS is inside the posting radius; record the GPS waypoint.
- 2. Photograph the current state of the unmet need (the gap, the condition, the absence) with a clear timestamp — the photo must show what is missing or failing, not just a streetview-style shot.
- 3. Document the community impact: record at minimum one household or resident account of how the need affects daily life; note the population affected (households, block, facility) and the primary harm (health risk, access barrier, safety hazard, environmental degradation).
- 4. Map the need to a named SDG target: record the SDG number and target (e.g. SDG 11.7, SDG 6.1, SDG 2.1, SDG 11.1) and confirm the need matches the target's scope.
- 5. Identify the vertical lane the work belongs to: housing (renovation/healthy-home), food (provenance/delivery), water, urban-canopy, or the appropriate ecological lane — state which existing protocol work type would provision the solution.
- 6. Look up and record the named intake target — the specific program, agency, or case queue the need should be routed to (e.g. city work-order URL, federal program intake, lead service line replacement registry); document the current gap between the need and the intake.
- 7. Compile the intake record: GPS, photos, SDG tag, community impact note, vertical lane, named intake target, and any program reference numbers; sign it as the identifying worker.
If it does not match the plan
- Need cannot be GPS-confirmed on-site (remote or inaccessible location) -> document the reason; do not claim on-site verification; the intake is still useful but must be labelled 'remote identification, unverified on-site'.
- No community impact statement obtainable -> the intake may still be useful as an environmental observation, but the intake should note 'no resident impact confirmed'; the protocol prefers lived-experience evidence for SDG need intakes.
- Multiple SDG targets apply to a single need -> record all applicable targets; the primary one is the most proximate (the most direct unmet need, not the upstream cause).
- Regulated work required to address the need (e.g. water testing, electrical, abatement, structural) -> route to the appropriate licensed-pro lane; the intake documents and refers, never attempts the regulated work.
What counts as done
- GPS waypoint inside the posting radius with timestamped photo showing the unmet need
- Community impact statement: at least one named household or resident account of the harm
- SDG target recorded with number + target (e.g. SDG 11.1 adequate housing), matched to the need
- Named intake target: a specific program, agency, or work queue the packet can be routed to
- Vertical lane identified: housing / food / water / urban-canopy / other protocol lane
- The intake record is actionable — a coordinator can hand it to the correct program without re-investigating
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.